dark light

  • Dazza

Nimrod production halted…….

BAE Systems has ‘temporarily’ halted construction of the MRA.4 until contract and design problems have been resolved……

http://news.bbc.co.uk/1/hi/england/2780765.stm

Regards, Dazza.

No replies yet.
Sign in to post a reply