September 1, 2011 at 3:51 pm
With the subsidy promised by Netherlands, Rekkof plans to build first F100NG in two years:
http://www.aviationnews.eu/2011/08/31/prototype-of-brand-new-fokker-100-airliner-will-be-ready-in-two-years/
Shall the prototype fly within the year 2013?