June 14, 2002 at 9:08 am
It’s crazy – we’ve recently opened the new Swanwick Air Traffic Control Centre which deals flights within England. Yesterday, ATControllers supposedly said that there was a slight risk because of the workload being put on them. Some may ask, why is Terminal 5 at Heathrow being given the go ahead when there is going to be delays and possibly cancellations because of Air Traffic Control Problems?!
http://news.bbc.co.uk/hi/english/uk/newsid_2041000/2041946.stm – Full Story