dark light

Reply To: Gollevainen's picture request part VIII: Russian ECM system

Home Forums Naval Aviation Gollevainen's picture request part VIII: Russian ECM system Reply To: Gollevainen's picture request part VIII: Russian ECM system

#2046666
Gollevainen
Participant

MR-500 Kliver is called Big Net by NATO.
Fut-N is Slim Net.

But if the rif was cancelled before the pr. 56, then would it be strange that it would be fitted on the pr.56M which followed it?
To make things more clearer, here’s a linedrawing from the pr.56M, I’ve marked the radar which I’m talking about.