dark light
UK delays full operating capability for F-35B fleet by two years
The UK’s Lockheed Martin F-35B Lightning II force has suffered a schedule setback after it was revealed that full operating capability (FOC) for the fifth-generation multi-role stealth fighter fleet – which was initially planned to be declared in 2023 – has now slipped by two years to 2025. This schedule slippage was revealed on September 12 by James Heappey, Minister of State for the UK Ministry of Defence (MOD), in response to a Parliamentary written question from John Healey, Shadow

Topics

Read more about La RAF entrega ayuda a Pakistán tras las devastadoras inundaciones
RAF’s 6 Sqn opts for more traditional squadron badge for Typhoons

Subscribe to Read More

This premium article requires an active subscription to its publication.

I’m an existing subscriber, sign me in!

from our leading aviation publications

Premium Key Aero subscribers get access to read all our magazines online as soon as they leave the editor’s desk.

our-landing-logo8
our-landing-logo7
our-landing-logo6
our-landing-logo5
our-landing-logo4
our-landing-logo3
our-landing-logo2
our-landing-logo1