March 15, 2009 at 12:29 pm
Came across this link on the web this AM, it appears that an diving exhibtion to the wreck of the German Aircraft Carrier the Graf Zeppelin has been planned for later this month.
I was, mistakenly, of the opinion that the Graf Zeppelin was scrapped after the war, obviously not !
By: EN830 - 15th March 2009 at 23:00
Exhibition, expedition, well something like that. Where am I Nancy?
Welcome to the club Ian, I’ll get you measured for the Zimmer. đ
Mark
In my defence the present Mrs En830 was standing behind me, which is very very unnerving.
By: Arabella-Cox - 15th March 2009 at 18:17
Did someone mention the “a” word….??
Are you sure its not just wreck diving, wreck recovery or wreckology? Oh…maybe, scrub wreckology on second thoughts. If its an ‘ology it might need a qualification?! :diablo:
Readers of another thread will understand!
Sorry JDK, Creaking Door, Stuart, Malcolm McKay et al. Couldn’t resist a teeny weeny bit of flippancy! Maybe you’ll forgive me?
By: Arabella-Cox - 15th March 2009 at 17:29
It is good that she will be treated as a piece of maritime archeology like the bismarck (but not as deep obviously) and not the sideshow like Titanic has become, as there is still lots to learn about the ship even from her wreck.
Last year was a good year for shipwrecks (Komoran and HMAS Sydney as well) i wonder what else is out there to find maybe someone can go and find and film Musashi?
curlyboy
By: Mark12 - 15th March 2009 at 13:36
Exhibition, expedition, well something like that. Where am I Nancy?
Welcome to the club Ian, I’ll get you measured for the Zimmer. đ
Mark
By: antoni - 15th March 2009 at 13:26
Plans for a shipped-based air force started soon after Hitler became Chancellor in 1933. The first plans were limited to supplying the existing battleships and cruisers with reconnaissance seaplanes. On March 12th 1934 the first requirements the future aircraft carrier was given. Within a year the design study had been completed. The model used was the British Courageous class of carriers. On June 18th 1935 the signing of the British-German naval agreement set the future strength of the German Navy at 35% of the tonnage of the British fleet applied to all classes of ships. This opened the way for building the first German aircraft carrier. Based on British tonnage of the time, 38,500 tons, this allowed for two ships of 19,250 tons. Officials were sent to England to attend the Navy Week where HMS Furious was opened for visitors but little was learned. More successful was a German Commission allowed to visit the carrier Akagi in Japan where they were given 100 copies of the blueprints of the air deck facilities. However, the Japanese neglected to tell them that the carrier was about to be completely rebuilt and the plans were obsolete.
At the end of 1935, when the design of the carrier was mostly completed, it received the consent of the commander of the navy. On 16th November 1935 the order to build the âAâ carrier was given to the Deutsche Werke Kiel AG. At that time most of its resources were engaged in building other warships and its slipways were occupied by ships under construction. Therefore construction was delayed until 28th December 1936 when it was possible to lay the keel on Slipway 1, twenty days after Battleship âEâ â the Gneisenau â had been launched from the same slipway. The slipway construction stage took two years. The ship was launched by Countess Hella von Brandenstein-Zeppelin, daughter of Count Zeppelin, on 8th December 1938 in the presence of Adolf Hitler. Work progressed during 1939 and by August it was estimated that the first tests could be carried out in June 1940 and the ship ready for service by the end of that year. When war broke out the Graf Zeppelin was 85%-90% completed. The engines and boilers were in place, the auxiliary machinery prepared though not yet installed and the 15cm guns were in place as well but lacked armoured shields.
The order for carrier âBâ was placed on 16th November 1936 with the Friedrich Krupp-Germania shipyard. The laying of the keel could not have taken place until the second half of 1938, after the heavy cruiser âJâ had been launched, because only one slipway (VIII) could accommodate the carrier. The date, 30th September 1936, given in some sources is invalid and probably a misprint. 30th September 1938 seems the most likely date. The construction of the âBâ carrier was intentionally slow because of the possibility of using experience gained from trials of the Graf Zeppelin in the âBâ construction. The planned launching was 1st July 1940 which did not take place as the order was cancelled on 19th September 1939. The ship had been finished up to the armoured deck. On 28th February 1940 Admiral Raeder ordered the dismantling of the hull. The âBâ carrier was never given a name. Peter Strasser is ascribed to the carrier by some sources but is entirely speculative and it is questionable that Hitler would have approved it even if it were on the list of proposed names.
After the start of the war, works on the Graf Zeppelin continued as planned for a while, but soon delays were caused by the extensive U-Boat building programme. [Carriers were always last in construction priority. Until 19th September 1939 the priority was: battleships, submarines, destroyers, cruisers, aircraft carriers.] In October 1939 Hitler allowed only the building of small ships and the continuing construction of five large ships, the Graf Zeppelin among them. It was the German conquest of Denmark and Norway that had an adverse affect on the shipâs fate. Defence of the long the Norwegian coast required many small ships and their construction became the priority. During a conference with Hitler on the 29th April 1940, Admiral Raeder proposed stopping all work on the carrier. Even if the ship was commissioned as planned at the end of that year, equipping her with guns would take another ten months, if not longer, and the installation of the fire control system several more months. (The original fire control system had been sold to the Soviet Union. In the end the AA and 15cm guns were removed and sent to Norway to be incorporated in the coastal defence system.) During a conference in July, Hitler referred to aircraft carriers saying that Germany must have âa cruiser with a flight deckâ. Ludicrous as it was to start a new project when the existing carrier was almost complete, it was Hitlerâs remarks that stopped all work on the Graf Zeppelin on the 12th July 1940 and the Design Bureau to prepare a design of an âMâ cruiser that could carry 14 aircraft. On the same day the Graf Zeppelin left Kiel for Gdynia (called Gotenhafen by the Germans). The ship remained there almost a year until Hitlerâs decision to attack the Soviet Union on 22nd June 1941. Because of the treat of Soviet air raids the Supreme Command of the Navy ordered Group North to tow the ship further west by 19th June. The carrier left at noon 19th June and reached Stettin on afternoon of 21st June. There she was moored at Hakenterasse, remaining until German forces had penetrated far enough to lift the threat of air attacks. On 10th November 1941 she left Stettin to arrive a week later back at Gdynia. She was then used as a floating warehouse for hardwood under the name Zugvogel.
By the end of 1941, the crippling of the Italian fleet in Taranto, the Home Fleetâs interception of the Bismark and especially the Japanese attack on Pearl Harbor had proved that ship-based aircraft were a fully developed and dangerous weapon. The Seekreigsleitung pressed for completion and putting into service of the Graf Zeppelin as soon as possible. The final discussion took place on 16th April 1942 at Hitlerâs Wolfschanze headquarters. The results were as follows:
1. Works on the hull and engines were to be completed by summer 1943.
2. The only available aircraft types, adapted Me 109 and Ju 87, required upgrading of the air facilities, especially installation of stronger catapults. Design, production and testing of these would take not less than two years so it was decided to modernize and adapt the existing catapults which would take six months. This gave the earliest possible time to complete the carrier as the winter of 1943/44. From the point of view of the Luftwaffe constructing a new carrier-based aircraft was impossible before 1946.
3. The Luftwaffe would provide the Kriegsmarine ten fighters and twenty-two bombers to be used in the reconnaissance role. Designing a torpedo-bomber was opposed by Hitler who thought such aircraft were not useful.
On May 13th 1942 the decision was made to resume the construction of the Graf Zeppelin. Along with changes to the air facilities there were other alterations considered necessary as early as 1938/39 because of the developments in naval technology. The superstructure was obsolete. The existing mast had to be replaced with a heavier one fitted with a fighter command post and radars. The bridge and fire control centre covered with fragment-proof armour. A higher funnel shield was necessary to protect the fighter command post from smoke. The alterations resulted in a significant increase in weight that needed to ne neutralised to keep the ship stable. Bulges were added to keep the ship upright. The secondary role was to protect the shipâs interior from torpedoes. Parts of the bulges served as oil tanks. These additions improved the manoeuvrability and range of the ship. AA protection was also upgraded. The planned air component was composed of 28 Ju 87s and 12 Bf 109s.
The Supreme Command of the Navy expected that work would be completed by April 1943 with the first sea test performed in August. However, the last twelve months of construction were to be carried out at the cost of cancelling VVIIC U-boats at Deutsche Werk AG Kiel. As well as the Graf Zeppelin, five other ships were to be converted to aircraft carriers. Due to the shortage of workers and lack of material, especially steel, Hitler decided to cancel the conversion of existing warships and put the workers and material into building the aircraft carriers Graf Zeppelin, Seydlitz and Potsdam. Meanwhile, due to increasing air threat, the operation to move the Graf Zeppelin to Kiel was delayed. She finally left Gdynia on 30th November 1942. On 3rd December the convoy reached Kieler Forde andf the Graf Zepplin anchored to the Heikendorf roadstead. On 5th December she was put into the Deutsche Werk floating dock where work on the bulges started immediately. At the same time work on the engines room was started to make the two inner shafts and their propulsion system operational allowing the ship to make a top speed of 25 to 26 knots. The objective was to finish the carrier in the autumn of 1943. On 30th January 1943 Hitler ordered all capital ships to be put out of service and cancel the construction of those not yet completed. Grand Admiral Raeder described it as âthe cheapest sea victory England ever wonâ and was the direct reason for him being relieved from duty. On 2nd February 1943 the construction of the Graf Zeppelin, on which the bulges were still being installed, was stopped for good. On April 15th Deutsche Werk shipyard were ordered to prepare the ship to be moved to Gdynia. After these preparations the carrier was towed out on 20th April, its destination now Stetitin. There she was anchored on one of the forks of the Odra River and camouflaged to look like a small island. The initial plan of moving the ship to Pillau was abandoned because of a lack of adequate anchor ground. The end of the carrier came soon after the Red Army entered the territory of the Reich. First all the kingston valves were opened and the ship settled on the bottom. Then a ten-man squad prepared the ship for blowing up with depth charges. On the 25th April 1945 at 6pm the order was given. Thick smoke issued from the funnel, proof that the charges had gone off as planned.
In April 1945, Soviet troops found the carrierâs artillery had been dismantled, the installation of fire control equipment had not been finished and the electrical installations partially installed as well as the flight equipment. There was a complete engine room and the power station was fully operational. Among the explosives, ten depth charges had been set of in the engine room. Water had penetrated through small blow-holes, cracks an leakages and the ship settled on the bottom in water seven meters deep. Seepage was so slow the water in the engine room was lower than that outside the hull. By 17th August 1945 the ship had been examined by teams of the 77th Emergency Rescue Unit. The carrier lay on the bottom with only half a degree of list to starboard. On the starboard were 36 holes up 1.0 X 1.0 meters made by shells and fragments. All the turbines, boilers and power plants had been blown up damaging the nearby watertight bulkheads. One .8 x .3 meter hole had been blown in the underwater part of the ship along with a .3 meter crack. The propellers had been dismantled and placed on the flight deck to minimize electrochemical corrosion of the hull. The aircraft elevators had been blown up as well. The ship was raised by simply sealing the underwater hole and crack and pumping out the water. Ten longitudinal and twelve transverse bulkheads had to be sealed to give the ship the necessary buoyancy. Cracks above the waterline and portholes were sealed with wielded metal sheets. Due to extensive damage and time pressures damage to shipâs deck were not mended. After the repairs were completed the ship was towed to ĹwinoujĹcie, the former Kriegsmarine base known as Swinemunde. On 19th August the hulk was included in the Soviet Navy as a spoil of war. At the Potsdam Conference (17th July until 2nd August) the first agreement was reached on how to dispose of captured German surface vessels. On 23rd January 1946 an Anglo-American-Soviet committee was formed to deal with these matters. All combat and auxiliary vessels were divided into three categories A,B or C. The Graf Zeppelin was given to the Soviets by lot and came under category C â ships sunk, damaged or unfinished that required over six months of repairs using the resources of German shipyards. It was the recommendation of the committee that category C ships should be scuttled in deep water or dismantled by a given date. Admiral Kuzniecov requested to repair the Graf Zeppelin for use as an experimental platform for the construction of Soviet aircraft carriers. Initially he was given approval for the Baltic shipyard in Leningrad to carry out the necessary repairs; however the authorities chose the simpler option of complying with the terms of the allied agreement. On March 17th 1947 a resolution was passed that all category C vessels were to be destroyed in 1947. The command of the Soviet Navy had managed to convince the government to run durability tests on the vessels.
From 2nd February 1947 the Graf Zeppelin was classified as experimental platform PB-101. The destruction was to be carried out in a manner that allowed the collection of experimental data and experiences. A special committee head by Vice-Admiral Rall was formed and ordered to sink the carrier while testing its resistance to aerial bombs, artillery shells, and torpedoes in teo variants, static and dynamic. Static meaning that the munitions would be placed in the ship and detonated and dynamic that they would be delivered by silulated attacks. The detonation of mines at various depths and distances from the ship was also considered. Between the tests teams of scientists would be sent aboard to assess the effects of the explosions. They were allowed to conduct minor repairs too stop the ship from sinking too soon.
At 2.45 pm on 14th August 1947 PB-101, as she was now known was pulled out onto the out roadstead of ĹwinoujĹcie from where she was escorted by various vessels to the fivemile square designated as the test area. Due to draining of three starboard rooms in the bulges she had a 3 degree list to port. When she arrived o the evening 15/16th August if was found that she could not be anchored. One of the main anchor chain links failed and the light kedge anchor could not prevent the ship from drifting. This was to affect the final outcome of the testing.
The first tests were carried out on the morning of 16th August. First a FAB-1000 bomb was exploded in the funnel along with three FAB-100 bombs and two 180 mm shells set under the flight deck. For the second test a FAB-1000 bomb was detonated on the flight deck. For the third a FAB-250 was set off on the flight deck and two 180 mm shells on the upper hangar deck. For the forth a FAB-500 over the flight deck set on a 2.7 meter high tripod, a FAB-250 on the upper hangar deck, another on the flight deck and a FAB-100 on the C deck. The fifth and last of the series, a FAB-500 and FAB-100 detonated on the flight deck with part of the bombs set deep in holes cut in the deck to simulate penetration.
The funnel was ripped open down to the flight deck but the island was not damaged, with the shockwave failing to deform the smoke ducts. No increase in pressure in the boilers was reported and on the armoured gratings an intact spiders web was found. Of the three FAB-100 bombs detonated on the flight deck the most damaging was the one not set in the deck. The shockwaves of those set in deck were directed down into the hangar. The 180 mm shells caused various damage, the most effective being mixed armour piercing high explosive.
After the first series of tests an air raid was carried out on the ship by 39 aircraft from the 12th Guards Mine Torpedo Division and 25 Pe-2 dive bombers. On the day of the test there were only 100 P-50 exercise bombs available in the entire 4th Fleet instead of the 156 required. Therefore only 24 Pe-2 crews could perform the bombardment. Two nine plane flights droped their payloads on the their leaderâs signal, the rest individually. A white 20 x 20 meter cross had be painted on the flight deck with arms 5 meters wide. The first group dropped 28 bombs from a height of 2070 meters, the second 36 from about the same height and the third attack carried out individually another 24 bombs. Three aircraft were forced to emergency dump their ordnance. The affects of the attack on what was a âsitting duckâ were farcical. Of the 100 bombs dropped only six hit the target, and there were only five marks on the flight deck. (Soviet pilots claimed there were eleven hits, some of the bombs having struck already damaged areas.) The test failed to give any useful information. The P-50 bombs were too small causing 5-10 cm dents in the flight deck and blew a hole about one meter in diameter in the starboard bulge. The pilots complained about poor visibility.
Another series of static explosions followed. After the forth series the entire island was wiped out and the upper hanger seriously damaged. The effect of the fifth series was the most spectacular. A FAB-550 bomb on the flight deck blew a three meter hole and a FAB-100 bomb in the hanger demolished all the light walls and destroyed the equipment. That concluded the static tests and preparations for the testing of underwater munitions where begun. On 17th August the weather bean to worsen and the carrier started to drift towards the shoals. There was the possibility that the ship would drift into waters too shallow to sink her. Rall decided to abandon the testing and finish off the carrier with torpedoes. The pallned bombardment by cruisers had been cancelled because of an accident in one of the main turrets of the Molotov. The usage of the 180mm artillery was banned in the entire Soviet Navy for the year 1947. Three torpedo boats and the destroyers Slavny, Srogy, and Stroiny were summoned. The torpedo boats arrived first. The first run by TK-248 was unsuccessful, the torpedo passing under the carrierâs keel. After 15 minutes a torpedo fired by TK-503 hit the starboard side near frame 130. The explosion destroyed the bulge but the armoured belt remained unscathed. After an hour the destroyers arrived and the Slavny hit again the starboard side near frame 180 where there was no bulge. The carrier began to list to the twice damaged starboard. After 15 minutes the list reached 25 degrees, and the ship started to trim to bow. After another eight minutes the Graf Zeppelin with a 90 degree list 25 degree trim to bow slipped below the surface. The date was 18th August 1947.
The results of the tests were kept secret and the allies only informed that she had been sunk. The gap between the summer of 1945 when she was raised and March 1947 when her fate was decided remains a mystery. The German Admiral Ruge claimed in a book that the carrier capsized while being towed from Stettin to a Russian port due to the stowage of steel sheets on the flight deck According to gossip circulating in the Baltic Fleet published by Marek Twardowski in a magazine article, in 1946 the ship was towed to a Leningrad shipyard to be prepared for service. The authorities found this a welcome occasion for the transport of heavy loot which was placed on the flight deck because the damaged elevators prevented the stowage in the hangers. Placing a heavy weight on the flight deck made the ship unstable and she capsized in the shallow fairway. Most of the goods from the flight deck fell in the water, whilst those stored below caused serious damage to the bulkheads and braces. Raising the ship was not difficult but she was no longer suitable for reconstruction and had to be sunk to cover the accident. This supports the account of Ruge but most probably untrue. There are photographs taken in1947 anchored on the Oder after being raised, still festooned with camouflage netting supports. A crane on the starboard side has been temporarily fitted to aid repairs. These photographs show stories that the carrier was towed a Russian port in 1946 where she capsized and was raised again to be nonsense.
By: Ant.H - 15th March 2009 at 13:07
Interesting to read that they’ll be using a ‘U-Boat’ on the expedition!
She was captured by the Soviets at war’s end, and was sunk during bombing tests in August ’47.
http://www.geocities.com/Pentagon/2833/kriegsmarine/carrier/grafzeppelin/grafzeppelin.html