
Marine Heavy Helicopter Squadron 465 (HMH-465) has taken delivery of the first Sikorsky CH-53E Sea Stallion, BuNo 161282/YJ02, to complete the H-53 Reset programme in the Western Pacific.
The announcement, made on March 7, 2019, marked the return of the helicopter following a combined planned maintenance interval (PMI) and H-53 Reset managed by the Fleet Readiness Center Western Pacific.
Maintenance on the helicopter was performed by Korean Air Lines in Busan, South Korea. A PMI is required very 900–1,600 flight hours or ten years, whichever occurs first. According to the US Marine Corps, the PMI accomplishes preventative, corrective and investigative maintenance functions designed to improve aircraft material condition and facilitate availability.
Lieutenant Colonel Christopher Roy, Commanding Officer of HMH-465 said: “The Reset programme’s goal is to provide long-term health to the CH-53E. Reset aircraft have proven to be more reliable, with higher mission-capable rates, than non- Reset aircraft.”
Read more about El Ministerio de Defensa ruso firma un acuerdo para la adquisición de más Fullbacks Etihad to begin Vienna services
This is a premium article and requires an active Key.Aero subscription to view.
I’m an existing member, sign me in!Premium Key Aero subscribers get access to read all our magazines online as soon as they leave the editor’s desk.