Tubing was originally T50 spec, now pretty much unobtainable, and hugely expensive.
Bear in mind, that the ends of the tubes will need to be squared off, in order to assemble the structure.
Talk to such as The Cambridge Fighter and Bomber Society who have built much of a Hurricane.
Bruce