Home › Forums › Naval Aviation › Northrop Grumman Awarded $24.6 Million Planning and Design Contract for CVN 79 › Reply To: Northrop Grumman Awarded $24.6 Million Planning and Design Contract for CVN 79
http://www.nn.northropgrumman.com/cvn21/http://www.defenseindustrydaily.com/2006/11/design-preparations-continue-for-the-usas-new-cvn21-supercarrier-updated/index.php#more The pictures on the NG website show that it will have one big elevator less. And the bridge is way back, exactly the opposite of what the CVF will be.
http://www.nn.northropgrumman.com/cvn21/http://www.defenseindustrydaily.com/2006/11/design-preparations-continue-for-the-usas-new-cvn21-supercarrier-updated/index.php#more
The pictures on the NG website show that it will have one big elevator less. And the bridge is way back, exactly the opposite of what the CVF will be.
As with CVN-78.