This is the May update I read a coupe of weeks ago and no doubt the next will follow whenever they are ready:
Bristol Blenheim Update – May 2013
With the airframe in the ARC hanger work is progressing well.
The rudder, elevators and ailerons have been painted in their final colours and are fitted to the airframe, the control and trim cables have now been connected and tested.
The aerial mast and cable are now in place as is the majority of the instrumentation.
The top front hatch, lower rear hatch and the two starboard outer bomb doors and fittings are in place and the two port outer doors should be on the airframe soon, this will allow the gun pack to be bolted into place.
Work on the engine nacelles is nearing completion.
The hydraulic systems for the flaps, undercarriage and turret have been operated and checked.
We would like to thank everyone for the generous donations received and also praise the immense efforts involved by those who raise funds and for your continued support and encouragement.
The Blenheim will fly again.