dark light

  • Daniel

Australian Twin Pioneer restoration progress

Today the volunteers did further work on the Twin Pioneer which included flap deployment checks, system inspections, propeller feathering checks along with both engines runup. https://www.facebook.com/TwinPioneer/posts/324339297948570

No replies yet.
Sign in to post a reply