Beech SRA Hangar doors Finished
We have at last almost finished the Beech SRA (Slow Reaction Alert) Hangar. The outer sliding doors were finally completed apart from painting. The last sheet was fixed on 07.07.07.
Still need to fit the remaining top guide rails and support outriggers at each end.
The last piece of fabric covering has been installed and we need to install front door guttering. Right angle returns also need to be fixed along the edges of the vertical cladding to prevent the westerly winds taking the cladding off.
A personnel door will be fitted to the front right door. Electrical connections and lighting, work benches and an office will be constructed or installed in the next few weeks then we can start to work on the Beech again after s gap of over 2 years.

Shot with Canon PowerShot S3 IS at 2007-07-10

Shot with Canon PowerShot S3 IS at 2007-07-10

Shot with Canon PowerShot S3 IS at 2007-07-10

Shot with Canon PowerShot S3 IS at 2007-07-10
By: Lindy's Lad - 10th July 2007 at 21:33
forgive me if its a little forward, but how much did all of that cost?
By: mike currill - 10th July 2007 at 21:05
Looking pretty good. I dread to think how many man hours went into that little project.