When did economics interfere with military budgets?!
It’s relevant if Embrear already positioning KC-390 as C-130B-H replacement. They already begin marketing on that approach. They already approach Indonesian AF with that strategy for example. Indonesia has 3 C-130 sq, 1 B and 2 H, and Embrear aiming for B replacement. I’m sure they also targeting other AF on similar approach.
LM heavily targeting customers equiped with legacy C-130 for J version, and boasted that the J is the only replacement which meet the legacy C-130 economics (operational wise). It’s Embrear job to proved C-390 can be match J economics, if they want to get the piece of legacy C-130 market.
Hopefully with the prototype already cone out, then we can begin to compared the operational economics between this and C-130J. This Afterall will be the real test for the future of Embrear transport.
If they rebuild OV-10, give stronger engine thus enable for better armour and bigger gun in the underbelly pod, then it will be more appropriate then A-10. Can be prepared in very primitive airstrip, thus close to conflict zone. Combine it with UAV, it can provide 24/7 rapid air support.
[ATTACH=CONFIG]231458[/ATTACH]
Still Indonesian AF C-130B in the Papuan conflict with the Dutch in early 60’s. From the id number 1301, it’s the first C-130B send by US. The picture show C-130B being loaded with Indonesian AF Mig-17.
F-414, EJ200, and M-88 being choose as alternatives for twin engine design. F-100 or F-110 being discussed by KAI for single engine design. Using F-100 or F-110 for double engine will increase the size outside the initial parameter of the design which come out on the 1st stage.
Indonesian C-130B and KC-130B, still operational after more than 50 years in the fleet (pictures from local Indonesian Forum). Indonesian AF operates 2 C-130 sq, 1 in Jakarta, consists of C-130H, other in Malang consists of C-130B. The third sq, plan to be operated in Makasar, using C-130H ex RAAF. The B’s now being upgraded by ARINC.
Yes, I there are thread for C-390…I just commented on previous post from Siddar that the market for better c-130 is already out. I believe on the opposite. Yes, the formula for A-400 seems in question from outside as replacement in the market for C-130 family. However it’s bigger and more capable tranport than C-130J, thus they will fill the market for those who need more than C-130J, but not so much as C-17.. While the Brazilian C-390, can be direct filling on C-130 family, with potential competitive economics.
This could be the next better Herc. Powered by one of the most common commercial engine, using many commercial based components, can potentially proved easy and economical to maintain. Well at least if Embrear able to fulfills that formula.
These missiles appear to be AIM-120A with the non-clipped fins. A mistake I assume because why would they bother? What does it say at the top of the weapon bay cutaway, are these bays supposed to house Mk84 bombs?
http://bemil.chosun.com/nbrd/bbs/view.html?b_bbs_id=10040&pn=2&num=74395
I’ll give you the link to more cutaways. Like I said before, this cutaways already circulated for sometime (from last year), when the design team finish their first stage work. Still this is very early, and the design team already put on their recomendation the need for mature fighters manufacturer as tech partner. I believe that’s why ROK FX III also put conditions on the winner for tech involvement for KFX.
One of the cutaway did put capability for MK-84 in the bay. Again, this is preliminary design, but seems the design team already reserved that capabilities. The second stage (development stages) I think will determine viability of internal bay that can be incorporated based on prototype performances. From what I read so far, the plan 5 prototypes will not yet incorporate internal bays, but already provide space for that.. Will see if this is going to change.
Rolls Royce intensifies their campaign for EJ200 toward Korean manufacturing the engine in conjunction for KFX program.
http://bemil.chosun.com/nbrd/bbs/view.html?b_bbs_id=10067&num=759
This website also provide more updated information on KFX program, including the cutaway Internal Bay design that I’ve posted before and other I posted below. For my understanding, ussualy their information more accurate on the development progress compared to others on line sources.
thanks for the reply.
And what numbers of KF-X in service is the TNI-AU looking at?
TNI-AU looking for initial demand of 50, while ROKAF, I believe between 120-150. For TNI-AU, they aimed initialy to used this project as replacement for 2 sq of Hawk 200/100 and 1 sq of F-5E/F. However seems looking on condition of TNI-AU F-5, it’s questionable they can be keep maintained operationally until 2020+ where those KFX projected to be ready.
Same thing with ROKAF that plan to used this as replacement for F-4 and F-5, but considering some of ROKAF F-5 from what I read on ROK media and forum, also questionable whether can waited until KFX ready. Thus I believe on both AF, the F-5 will be replaced by some F-16, which in turn later on be replaced by KFX.
Somehow I see that the planner on both AF also aimed this project to replaced not just F-4, F-5 and Hawk 200, but also in the end all F-16. Those F-35 that ROKAF going to procured, will not be replacement for F-16 or F-15K, but more on something new. Just like the planner in TNI-AU from what I heard also not aimed this project as replacement for Flanker family.
Ananda, what is the Indonesian AF’s view on the single-engine vs twin-engine debate for the KF-X? With 20% of the budget to be footed by Indonesia, I think that they may have a big say in what is eventually the final config of the KF-X..also, have any work share arrangements been made so far on this project? What parts will be manufactured in Indonesia and what about technology transfers?
I have post before in this forum before…both AF (ROKAF and TNI-AU) seems in the agreement for twin engine. However the Industry (Especially KAI and from what I heard also some team from IAe) seems inclined to single engine due to their cautions on over budget for twin engine. Do remembered single engine design come later on from KAI and not from the official design team (which KAI and IAe also heavily represented), as further alternative studies. Then again both AF seems will get the last says.
KAI and IAe already talking on work sharing, where for development stages there will be 5 prototypes where KAI responsible for assembling 4 and IAe 1. At least that’s what I heard from local media. Seems the agreement so far more on development stages (those 5 prototypes). More agreement will be talked later on after the development stages.
Add:
The way I see, there is also one other factor that can be more influential. How big tech support the tech partner (more and more inclined to LM) going to support. The design team conclusion from 1st stage (design development) from what I heard already pressed that they need matured Fighters manufacture as design partner on development stages. Some speculation says that the design team prepared cannard design if they got Euro Partner and other design if they get US partner. Whether it’s true or not, it show this project need Tech Partner, which can influence the final development.
Final design still has to get approval though from both ROK and Indonesian parliament, although Indonesian one will take cue from what ROK decide. In such, as like politicians all over the world, parliaments can still be swayed. Although at this moment seems the twin engine (C103) design seems got the favorite.
Thx for tho Info
The catapult system for the missiles is strikingly similar to the LM design.
So, we probably have a shallow arrangement for A2A and a bulges one (belly pack?) for A2G. Do I understand right ?
Well it’s early too tell. This drawing of C-103 internal weapons bay design, has been circulated for some time on Korean and Indonesian media and forum. For me, this just show, the design team has reserved internal bay on design, but how to move on this still to early to tell.
The design show LM influenced, wich seems related to ROK choices for F-35. Some in forums speculated (or claimed heard but can not be validated from design team), that they think only shallow internal bay design can be put to C-103, since more bulges one (which can acomodated A to G weapons) is more complicated to adopt with initial C-103 design.
The initial design mock up (from KDN sources) for C-103, did not put internal weapon bay. However looking on the mock up, probably the shallow internal bay can be adopted. Then again, at this time, anything still can be speculated.
The C-103 design of KF-X, which seems going to be finalised still going for internal bay. Whether the first batch already equiped with this, it’s still being discussed.
The numbers must be wrong. US $93 billion for KF-X development is inconceivable. IIRC F-35 development costs have not reached US $50 billion yet.
Yes seems thats wrong calculation there. 1 trillion Won supposed get USD 970 mio. So the number should be USD 9.3 bio. This is still in line with initial number of USD 10 bio on development budget. However KIDA now think that number only can match for single engine, while the ROK Join Chiefs office still think that number can covered twin engine design development costs.