S-70 and Su-57: pair flight
Production line of new R-74M ( export RVV-SD )
Fix: R-74(without “M”) RVV-MD(short-range)
Current state:
T-50-1 – 253 hours, 215 landings.
T 50-2 – 230 hours, 232 landings.
T-50-3 – 327 hours and 168 landings, performing weapon testings.
T-50-4 – 206 hours and 143 landings, performed the repair of fuel leaks in the chassis bay, main and side weapons bays.
Т-50-6-2 is currently at work of RAM coating, T-50-9 is in the final assembly stage.
forums.airforce.ru
What happened to that SLAT? (see inside pylon position).
Remnants of the old paint. Stripes in the area of the pylon №2 remained since the tests of D-236T, and D-27 engines, were used for visual control of icing in the areas where blown by propfans.
Any news about T 50-3
According to the latest data, N036 AESA is in installation process on T-50-3. (thanks to prototype)
and what are the latest documents about at paralay forum?
It’s about pyro-launcher.
I don’t think it can be ‘today’ ???
“Today”. I mean modern times.
For history:
http://rutube.ru/tracks/4740855.html
Demo-flight:
http://rutube.ru/tracks/4729648.html