The second ship Pahang
Still not ready ? :confused:
The first customer of a COSYS combat system for above water.
It seems that gun integration is much harder than torpedo integration. 😮
On 3 April 2006:
The remaining trials are expected to be completed before June this year
On 9 December 2005:
will conduct the cannon trial in the near future

The first vessel namely Kapal Kedah will be delivered after the trial of the main cannon and the 30mm cannon scheduled for next year
Source: Najib during Lima 2005
The second ship Pahang end of 2005 near Langkawi:
The Nigerian F 89 Aradu
Operational again and seen at the Trafalgar 200 Fleet Review, June 2005

Courtesy: http://www.thamesshipsociety.org.uk
korwety projektu 621
Danrh,
Poland is building at least one Meko 100.
Slow, but there seems to be progress.

More info here:
Yep,
but not on my webspace anymore.
Give me your e-mail and I send them.
Who asked for GK pics ?
reallight: Also, I’d like some more photos of the GoalKeeper. I can’t find much photos of it on the internet. It’s not easy to know more about the GoalKeeper if you can’t read in Dutch or Korean.
Goalkeeper, a deadly weapon. Shown once on the Bloys van Treslong during a sail pass.

Made to scale ?
I asume.
But you could do a quick check on length versus width
That type of data must be somewhere available.
Warship1, yes one of the boards I check regulary.
But this board goes down in a rapid way with all those poll’s.
regards
To Victor
Victor,
why do they have an UAE IDEX exhibition 1997 in the left top corner ?
Old stuff
Old stuff IMHO,
“Sea Arrow” , a concept from Royal de Schelde of more than 8 years ago.
Superseeded by the Sigma line, I think
Need the waybackmachine to find some stuff:
EuroNaval 2004
Here are some EuroNaval 2004 pic’s.
Gowind 120:
Gowind 170:
Gowind 200:
Looks to me as FREMM variants.