dark light

Prom

Forum Replies Created

Viewing 15 posts - 16 through 30 (of 267 total)
  • Author
    Posts
  • in reply to: INS Vikramaditya: Steaming towards Induction #2015870
    Prom
    Participant

    It takes up more space but this sort of approach is far better for operators.

    2 displays position is from Tacticos
    3 displays position is from BAES CMS On T45

    Obviously for older ship designs it would be harder to fit in these consoles as they would not have been designed with such space in mind, so I understand why the IN has not gone this route.

    Also, if you look at the 3rd image (simulated QEC ops room), you can see why I thought the number of console positions looked low for a carrier, I think this image is out-dated but is still relevant for these purposes. Note that the ENgineering position, duty room, Flyco positions shown on the picture earlier would of course be separate to this

    Prom
    Participant

    I hate to side with Lewis Page, but I do find it very suspicious that BAE is providing both the carriers and the F35B, and given the calibre of the senior people at MoD, I would not be in the least bit surprised if they have been led down the garden path.

    Sorry, but as I have posted before this is complete ********.
    1) BAES are just as involved with the F35-C as the B – it is Rolls who have a bigger involvement with the B than C
    2) Would BAES willingly turn down hundreds of millions of pounds of work?
    3) The estimates for the ship costs were produced as a series of deltas by a dedicated team. If you were to visit the ACA offices (as I have) you would see that serving RN officers are sat alongside the ACA staff, working on the same IT and able to see and review each document as much as they see fit. The conpsiracy theory would thus involve a large number of people, some of which are RN, and some of which were keen to go for the conversion as their jobs depended upon it (being non BAES contractors etc).

    Prom
    Participant

    Just loose wording, often from people who do not understand the details of the issue I suspect.

    I don’t think that it was ever explicitly stated as “just the cost of converting the ships”. It was referred to as “conversion of the carrier” etc, but that can be taken to include whatever you like really.

    in reply to: INS Vikramaditya: Steaming towards Induction #2015890
    Prom
    Participant

    It is the vertical orientation of the 2 screens that reminded me of the 1990s in particular. That was a fairly short term approach which was rapidly discarded when it became apparent that cognition was much less effective from that upper display. So although there are many such examples left, it seems dated to me. I may be wrong on the exact date though.

    As for Senit? No one specific thing, several little things where I think (for example) Tacticos or the BAES CMS (whatever it is called this week) are better, but I can’t think of any things at which the Senit family is better. Senit is OK, but I certainly wouldn’t choose it as my “must have” CMS

    in reply to: The UK F35 debate topic (separate from CVF discussion) #2015895
    Prom
    Participant

    Regrettably I cannot Swerve.

    At the time, I along with everyone else could not reconcile the cost of converting the ships with other comparable costs. It is true that the public statements do seem to imply that it is just the cost of converting the ships.

    However I have learned since then, that the cost actually included other factors (not just tanking) that would be necessary to make the conversion work.

    Whilst I cannot provide any supporting evidence, I think you will agree that this explanation is more credible than the conspiracy theories that have been proposed about BAES seeking to scupper the conversion by quoting high

    in reply to: The UK F35 debate topic (separate from CVF discussion) #2015901
    Prom
    Participant

    The stupendously expensive CATOBAR conversion cost quoted did not include anything for tankers. It was for changes to the ships.

    That was what was assumed. Wrongly

    Integration of a buddy refuelling pod on F-35C would have been an additional cost – but one which should have been relatively small.

    Apparently not

    in reply to: The UK F35 debate topic (separate from CVF discussion) #2015938
    Prom
    Participant

    If I’m not mistaken……….carrier born tanking is not a requirement for STOVL because no STOVL a/c can carry a refueling pod. i’m not too sure if thats going to be the case with the F-35B tho. The carrier born “tanker” on a CATOBAR ship would be the F-35C so I’m not really seeing where your argument is coming from. Granted this is the first I’v heard of it so if you could maybe expand on it I would be greatful.

    No, carrier tanking is not a requirement for STOVL because it is not needed

    F35-C does not come with a capability to refuel other aircraft, the UK would have had to fund the study, design, conversion etc all on their own (because no-one else needs the capability). Alternatively we would have had to purchase F-18s just for use as tankers.

    in reply to: INS Vikramaditya: Steaming towards Induction #2015941
    Prom
    Participant

    Lesorub-E. Developed by NPO Mars, an old institute that has been designing naval C2 systems for generations. Older versions of this system were installed on the Slava class cruisers and the Admiral Kuznetsov, among others.
    http://www.npomars.com/en/products/sis_upr_voen/asbu.php
    http://www.concern-agat.com/products/defense-products/66-npo-mars/173-lesorub-e

    Looks pretty advanced, though I would still have preferred a Western system like the Charles De Gaulle’s SENIT 7.

    Thanks for that. Looks quite early 1990ish system to me, in fact the console design looks almost identical to a UK design of that period. Is that picture to be taken literally and that is all the console positions? If so it doesn’t seem many for a carrier.

    I have to admit I am not a fan of the Senit 7 system either

    in reply to: The UK F35 debate topic (separate from CVF discussion) #2015959
    Prom
    Participant

    No, I am talking about the fact that with CATOBAR you need a carrier borne tanker in case of bolters. The price of such aircraft was built into the conversion cost as such a facility is not a pre-requisite for STOVL.

    Hence why the conversion cost appeared so high

    in reply to: The UK F35 debate topic (separate from CVF discussion) #2015964
    Prom
    Participant

    It would be PPP, and the fact is that the cost of introducing a tanker a/c (which is what made the CATOBAR conversion so expensive) prohibits a U-turn

    With respect to Pongolos question, The F35-B will in my view be more than a match for anything it will have to face in the next 25 years

    in reply to: INS Vikramaditya: Steaming towards Induction #2016040
    Prom
    Participant

    With the to my untrained eyes low freeboard and other changes to her design I am curious to see how she handles at speed and in any kind of chop. Not a criticism before people jump down my throat but going on how the Kuznetsov handles in rough seas and her rather pedestrian performance its a reasonable question in respect of the Vikramaditya.

    I am not so concerned about the freeboard, but that massive ramp does draw they eye. One wonders how that would handle a large oceanic wave.

    After that my main concern would be the propulsion. It is pretty ancient technology and does not have a great record.

    Does anyone know what command and control system she will have fitted?

    in reply to: QEC Construction #2016048
    Prom
    Participant

    No Jang, Block LB04 is not due to come up to Rosyth until November. They will then fit that and LB05 (which is already up there in 2 bits). Then all the remaining centre blocks (i.e. hangar and deck sections). Then the forward island will go in first quarter 2012 and then the aft island. Then we will have a ship (albeit still with quite a lot to do!)

    in reply to: QEC Construction #2016053
    Prom
    Participant

    LB01 is now in the dock, with the intention to skid blocks 2 and 3 together at the end of this month. Stick a centre block on top of LB02 and I think she might overtake HMS Ocean as the UKs largest “warship”

    in reply to: Underwater aircraft carrier #2016345
    Prom
    Participant

    I think it is irrelevant to argue about the vulnerability of surface ships inshore on a hostile coast facing supersonic missiles. It is undoubtedly a difficult threat to deal with.

    The real point is on Chaffers proposal to get around with this. It is unfortunate therefore that he has not answered my question to allow us to understand what he is proposing and highlight any difficulties that such a solution might present

    in reply to: INS Vikramaditya: Steaming towards Induction #2016368
    Prom
    Participant

    Thanks TR1 and Witcha.

Viewing 15 posts - 16 through 30 (of 267 total)