    The Command and Support Ship ABSALON is technical completed

    After several months with starboard side at the pier in Korsør, the ship could be declared finished, and ready for the extensive operative tests.

    After several months with starboard side at the pier in Korsør, ABSALON could be declared technical completed, and ready for the coming extensive operative tests.

    Finally it was time to get the machines running, after deeper water under the keel!

    Here at navalhistory.dk the building of the command and support ships has been followed and commented. That might have made it a little symbolic, that the supportship has chosen its second night at sea, almost right outside my window, but I guess it was a coincidence.

    Much has been written, and that’s the reason for me to let the Danish Defence’s official statements regarding the completion, speak for themselves, as stated below:

    Finished at time – almost

    The project with completing ABSALON for operations has been ongoing, ever since the delivery from the shipyard three years ago. And in spite of several problems underway, there’s only been a small slip in the time schedule.

    The ship was delivered late from the shipyard, and there have been problems with weld cracks developed around some pumps and the constructions of the mast.

    And the installations of everything from the kitchen to the radar, has been done, in a time with big changed for the naval bases and in the Danish Defence Acquisition and Logistics Organization.

    “For me, there is no doubt about, that the work only has succeeded, due to the strong involvement, from all the people on the assignment”, said the chief of the Danish Defence Acquisition and Logistics Organization, Rear Admiral Finn Hansen, when he participated in the 49th and last meeting of the leading group onboard ABSALON.

    Competitive price

    More than 60 workers, engineers, civilian and military technicians has worked full time, to get the military installations finished, the three years the installation has been ongoing. 200 workers from the workshops, on the naval bases in Fredrikshavn and Korsør, have worked on the ships in short periods.

    “The work with the complicated installations has been solved just as good, as any big foreign military contractor could do it, and that to a price that’s more than competitive. We can contribute that to our own workshops”, Finn Hansen said.

    ABSALON is already fully operative as a transport- and logistics ship. It cannot, however, be declared a fully operative warship, before it has gone through a long range of tests, so the crew can become familiar with the weapon- and sensor systems.

    These tests are expected to be completed in the spring of 2008.

    in reply to: Navy news from around the world, news & discussion #2047704
    gunner5″
    Participant

    Inspector-General of the Navy Wolfgang Nolting has published a 4-page article (in German) in the magazine Europäische Sicherheit.

    Some current developments, including confirmation of events:

    The third EGV has been included into budget planning (per BwPlan 2008). The navy expects to finish contract arrangements (including design changes) by April 2008, and propose procurement to parliament in Summer 2008. Planned commissioning would be 2012.
    NH90 NFH (MH90) requirement for the German Navy has been downsized to 30 helos. The navy is evaluating “alternatives” (including SLEP for the Sea Kings). The MH90 final order is still expected to be signed around late this year or early next year.how old are the German sea kings because both Canada and Australia have had huge problems with their fleet
    Type 212A SSKs second batch has been ordered and is building, first delivery in 2008 (second 2012). Nolting emphasized that the SSKs are needed for conventional naval warfare, and that such a capacity is mandatory despite the current emphasis on asymmetric warfare.
    The commissioning of the first two K130 corvettes is “imminent” in his words (all that’s been released so far was “sometime in 2007”)
    The P-3C acquired from the Netherlands are still in preparation process at Nordholz airbase. The Navy expects to have one P-3C ready for deployment by the end of the year, and considers this “urgent”. A likely deployment named is Horn of Africa in support of OEF-HoA, where a MPA has apparently been repeatedly requested by the US Navy.
    F125 – nothing new, same old vague stuff we’ve been hearing for the past half year.

    And now for the big stuff. Nolting has added two new projects to the currently-under-development BwPlan 2009 (page 4 in the article).

    “Joint Support Ships”, including military sealift capability. No details. And yes, “JSS” is the official project name.[B]seems the Germans are interested in the Canada JSS concept i think that kind of ship would be perfect
    The successor project for the 10 Type 143A FACs – a class of six corvettes of a new type.

    more in german:
    http://www.europaeische-sicherheit.de/Ausgaben/2007/2007_09/02_Nolting/2007,09,02.html

    U212A – 2ndBatch
    As submarines with their broad capability spectrum may also be part of such task forces, the requirement planning of the German Navy suggests a total of six submarines. Two units to be procured in the future are now being developed on the technical basis of the already available four boats. These two boasts of the second batch are going to have a few upgrades which include: more efficient fuel cells, high-energy batteries, longer detection ranges, improved communication systems, improved signature reductions, missile employment, anti-torpedo defence, employment of special forces as well as the possibility to conduct unlimited world*wide missions.
    After the Budget and Defence Committees of the German Bundestag (Lower House of Parliament) had given their approval to the procurement, the contract between the Federal Office for Military Technology and Procurement and TKMS was signed on 22 September 2006. The boats are to be built by the ARGE 2nd Batch U 212A consortium consisting of the TKMS shipyards HDW and NSWE and are scheduled to be delivered in the years 2012 and 2013. The new order comprises an amount of approximately 864 million euros and safe*guards jobs and ensures militarytechnological core capabilities of the German shipyard industry and their suppliers.

    Changes in Construction
    As far as the architecture of the boat is concerned, the second batch will be more or less identical with the first one. The length of the submarine will be extended by 1.2 m to 57.2 m, however. This extension will be in the tower area for the integration of an additional extractable device for SHF SATCOM. The employment in worldwide missions also necessitates the adaptation of the air conditioning system to tropical conditions. An adaptation of the magnetic self*protection system is also required. Was the delivery of frogmen/attack swimmers in the first batch still to be executed via the torpedo tubes, this will be changed in the second batch and effected through a separately installed swimmer airlock hatch. This measure will increase the safety and security and the efficiency in the delivery and engagement of Special Forces. In addition, there is now also the possibility for a compression-proof storage of their accompanying ordnance.

    Source: http://www.european-security-and-defence.com

    in reply to: Navy news from around the world, news & discussion #2047751
    gunner5″
    Participant

    According to the “Spiegel”, president Sarkozy offerd german chanclor Merkel a participation on french nuclear weappons. The “Force de Frappe” is protecting Germany and France, so a german involvement would be logical, Sarkozy sayed.

    Sorry, source only in german

    http://www.spiegel.de/politik/deutschland/0,1518,505887,00.html

    in reply to: Navy news from around the world, news & discussion #2048022
    gunner5″
    Participant

    Joint Support Ship for the German navy

    Joint Support Ships for the German navy

    There is a consideration of the German navy, which emerged in the past years always again to use : A ship, with which troops are regarded ready lake, outside by territorial waters, as an employment. A ship that with its communicationses the guidance of an operation can support. A ship, which is sent flexibly there, where the German Federal Armed Forces are to stand into the international employment in a coastal country ready.

    Before the spoke of the General Naumann, if the speech came on this virtual ship, designated after the general inspector at that time and later chairman of the NATO military committee. From this plans however nothing became. Into the 1990-er years was called the project Einsatztruppenunterstützungsschif (ETrUS) and failed like so much because of the missing money. The utterance of an admiral, it is not unforgotten has anything against it if the army orders such a ship – and the navy it then operates.

    Now there is a new approach, and that has the armed forces-common beginning already in the name: Joint support Ship is called the new project, naval inspector Wolfgang Nolting to the German Federal Armed Forces plan 2009 to already take up left. The new ships are to fulfill among other things the demand after a secured military sea-deployment capability.

    As it is right itself, also all this is embedded into a concept that the naval inspector in a name article in the magazine describes European security: The concept is called “basis sea”, a conceptional beginning for development the lake, in order own forces in the context of armed forces-common operations over and of lake time-fairly, flexibly, to a large extent independently shifts, holds ready, leads, protects and to support to be able.

    Navy will gets third Fleet Support Ship

    So that it does not come starting from 2010 no more to these bottlenecks, the navy is to get now as fast as possible a third Fleet Support Ship of employments. The Ministry of Defense took up this project to the budgetary planning for 2008.

    Thus the new building could already come 2010 in full swing. The ship is to become a sister the 2002 activated servicers “Berlin” and “Frankfurt/Main”. The 200 million euro expensive new building is to displace 174 meters long and approximately 20200 tons. The working group Flensburger shipbuilding company and Lürssen, which built also the two first servicers in Flensburg and chess rope village, has good chances on the order.

    in reply to: Navy news from around the world, news & discussion #2052431
    gunner5″
    Participant

    German submarine U 24 crept with maneuver undiscovered USS „Enterprise“

    The German submarine U 24 crept with maneuver undiscovered to American aircraft carrier. A simulated firing: The USS „Enterprise “, the largest aircraft carrier of the US-Navy, seen by the Sehrohr of the German submarine U 24. Neither the crew „of the Enterprise“ still the other US ships to their protection had the German submarine noticed to it emerged. The young remote travel, which is at the same time the first employment, leads the most modern conventionally propelled submarine of the world to the marginal sea one of the hottest crisis areas, for which the references Lebanon, Palestine, Iraq and Iran. The order of this boat of the class 212 A, which ran out few days ago with its crew from the naval base Eckernförde at the Baltic Sea, corresponds “intermediate two-wars” – to the situation in the Near East: loudless underwater espionage before the Lebanese and other coasts, clearing-up on navigation routes, message weapon transporters and speedboats of radical-Islamic combat teams camouflaged by Schiffsbewegungen, particularly of. Also the nearly inaudible German submarines prepare heavy concerns for different admirals: During a maneuver in the Karibik broke through a German Diesel submarine (U 24) the allegedly impenetrable defense ring around the US atomic aircraft carrier “Enterprise”, fired from favorable firing angle a simulated torpedo fan, photographed the aircraft carrier by the attack very much ear and emerged then without preliminary warning directly apart from the giant goal. A US admiral is to have been except itself. Another submarine of the type 206 A (500 ts) happened into the Karibik a US hunt submarine of the lot fishing rod it class (7100 ts, atomic drive) in small distance, set on it, several times, without the US crew would have recognized the close “enemy”. American submarine officers on board the German boat pursued the duel after testimonies “with welding drops on the forehead”.

    http://www.abendblatt.de/daten/2007/08/08/779801.html?s=2

    in reply to: Navy news from around the world, news & discussion #2057728
    gunner5″
    Participant

    Christening of corvette for the German Navy on the name OLDENBURG

    The fourth out of a series of five class 130 corvettes for the German Navy has been christened today on the name OLDENBURG attended by high-ranking guests from the German Federal Ministry of Defence, the German Federal Office of Defence Technology and Procurement, as well as various guests from the politics and economy.

    The christening took place in the building dock 6 at Blohm + Voss in the harbour of Hamburg. Godmother of the ship is Dr. Annette Schwandner, wife of the mayor of Oldenburg, Dr. Gert Schwandner.

    The invitation to the ceremony was made by the ARGE K130 – consisting of the ThyssenKrupp Marine Systems’ yards Blohm + Voss, as lead yard, and Nordseewerke (Emden) as well as Fr. Lürssen Werft (Bremen).

    The main task of the new class of corvettes will be intelligence-gathering and surface target attack. High mobility and combat strength combined with a considerably higher endurance enable this vessel to act even in remote sea areas. The Class 130 corvettes will replace the missile-carrying fast patrol boats of the Albatros Class. These boats do not fulfil the requirements for future operational profiles. The home port of the new corvette class will be Warnemünde.

    The K130 project is of high importance to both the German naval shipbuilding industry and the supporting industry. It strengthens their core business in key technologies. Regarding the platform and marine systems and the weapons command and control systems, the K130 features numerous innovations. A novel transport route concept assures short routes and optimum accessibility.

    Both in design and construction of the K130, the ARGE tries to get as close as possible to large-scale-production. Therefore, Blohm + Voss deliver corvettes Nos. 1 and 4, Fr. Lürssen Werft corvettes Nos. 2 and 5 and Nordseewerke corvette No. 3.

    Main characteristics:
    Length DWL: 82.80 m
    Moulded breadth, max.: 13.28 m
    Breadth DWL: 12.44 m
    Draft DWL: 3.40 m
    Sea endurance: 21 Days
    Range: >2500 sm
    Full-load displacement: approx. 1.840 t
    Speed: >26 kn

    in reply to: Navy news from around the world, news & discussion #2058494
    gunner5″
    Participant

    ThyssenKrupp-led consortium to receive 2,5 bln eur warships from the German Navy

    A consortium led by ThyssenKrupp AG’s Marine Systems unit expects to receive an order to construct four new frigates for the German Navy by the beginning of July, a spokeswoman for the unit said.

    The contract is to be signed shortly, she said, adding that the order of the frigates had already been approved by the Parliament’s budget committee.

    The Defence ministry said previously that the potential order volume amounts to about 2,5 bln eur.

    According to the spokeswoman the first frigate is to be delivered in 2013 and the last in 2016.

    The new multi-rolle-frigates will have two crews

    Specifications:

    Propulsion: CODLAG 32000kw
    endurance at sea 21 days
    operating range 4,000 nautical miles at 18 knots in AnDiNot-mode
    maximum speed 26 knots

    Dimensions:
    Length 148.00 m overall length
    Breadth 18.50 m main deck
    Displacement: 6800 ton.
    Deep: 5m

    Weapons:
    Harpoon (two four-cell Harpoon missile launchers)
    VLS Mk41 48-cell launcher (SM-2 and ESSM (Evolved Sea Sparrow Missile)
    2X 21 RAM (Rolling Airframe Missiles)
    1x 127mm Oto Melara
    2x 27mm MLG (Light Naval Gun System)
    5x 12,7mm RCHMG Oto Melara (Remote Controlled Heavy Machine Gun)
    2x 12,7 mm sMG
    4x MASS (Multi Ammunition Softkill System)
    2x MH-90 helicopters
    4x 33-ft-boats
    Underwater operated vehicles
    Accommodation: 120 + 50 Naval special forces + 20 Naval air wing crew

    http://www.zeiges.com/img/F125.jpg

    (Source © 2007 Bundeswehr / ARGE F 125)

    in reply to: Navy news from around the world, news & discussion #2059187
    gunner5″
    Participant

    The two patrol boats from the German fleet are old coast guard (police) patrol boats (Bremen 2 und Bremen 9)…here two pics….

    http://www.zeiges.com/img/jvcjc2zmql5.jpg

    http://www.zeiges.com/img/_640.jpg

    http://www.zeiges.com/img/5gMoS3tr.jpg

    in reply to: Navy news from around the world, news & discussion #2059352
    gunner5″
    Participant

    Take a look at this….German Fast Patrol Boats Gepard-Class (Type 143A) on UNIFIL

    http://video.google.de/videoplay?docid=633…53474&hl=de

    http://video.google.de/videoplay?docid=-13…17192&hl=de

    in reply to: Navy news from around the world, news & discussion #2059365
    gunner5″
    Participant

    606 million Euros for an F125, eh?

    Thats right, 656.000.000,00 Euros for each Frigate F125….

    in reply to: Navy news from around the world, news & discussion #2059404
    gunner5″
    Participant

    Deutsche Marine will für 2,6 Mrd Euro bei ThyssenKrupp und Lürssen bestellen

    Die Deutsche Marine soll einem Pressebericht zufolge vier neue Fregatten der Klasse F125 erhalten. Der Haushaltsausschuss der Bundestages wird den Auftrag zur Beschaffung im Gesamtwert von 2,624 Milliarden Euro bei seiner Sitzung am 20. Juni beraten und aller Voraussicht nach mit der Mehrheit der Koalitionsstimmen genehmigen, berichtet die “WirtschaftsWoche” unter Berufung auf Haushaltskreise. Die Beschaffung sei für einen Zeitraum bis 2017 vorgesehen, Hersteller seien ThyssenKrupp.

    2,6-Milliarden-Euro-Deal für Super-Fregatten vor der Genehmigung

    Der Haushaltsausschuss der Bundestages wird die Beschaffung von vier Fregatten vom Typ 125 im Gesamtwert von 2,624 Milliarden Euro bei seiner Sitzung am 20. Juni beraten und aller Voraussicht mit der Mehrheit der Koalitionsstimmen genehmigen. Das berichtet die WirtschaftsWoche aus Haushaltskreisen. Die Beschaffung ist für einen Zeitraum bis 2017 vorgesehen, Hersteller sind ThyssenKrupp und Lürssen. Die F 125 gilt in Marinekreisen als völlig neu entwickelte Super-Fregatte für Langzeiteinsätze in internationalen Krisengebieten und soll den neuen Aufgaben der Bundesmarine zur Bekämpfung so genannter „asymetrischer Bedrohungen“ durch Terroristen gerecht werden.

    in reply to: EuroAEGIS #2059896
    gunner5″
    Participant

    German Frigate Class F125

    http://www.zeiges.com/img/DeutscheMarine-ddx1.jpg

    in reply to: German Minehunter runs on ground #2066088
    gunner5″
    Participant

    But still….DEUTSCHE WERTARBEIT

    in reply to: German Navy – News and Discussion #2070400
    gunner5″
    Participant

    http://www.bilder-hosting.de/img/BN4B1.jpg

    in reply to: German Navy – News and Discussion #2072889
    gunner5″
    Participant

    New corvette K130 “Braunschweig” pics….

    http://s3.bilder-hosting.de/img/VD8SX.jpg

    http://s3.bilder-hosting.de/img/VD8VN.jpg

    http://s3.bilder-hosting.de/img/VD96S.jpg

    http://s3.bilder-hosting.de/img/VD99R.jpg

Viewing 15 posts - 61 through 75 (of 102 total)