Jobs at a pair of Lancashire jet-building factories will be secured if a £6billion order to sell aircraft to Japan is won.
Andy Latham, senior business development executive at BAE Systems, said parts for the 40 jets due to be ordered would be built at the firm’s factories at Warton and Samlesbury, near Preston, if it succeeded in landed an order to sell its Eurofighter Typhoon jets.
***
The bid from the four-nation Typhoon consortium, which includes defence firms in Germany, Italy and Spain, has offered the Japan “sovereign control” over manufacturing, support and upgrade on the jets.
Mr Latham said the value of the bid “compared favourably” with the rival US bids but admitted it would be a coup for the European bid to land the work with Japan having bought American aircraft in recent years.
He said the Japanese would be “very well-informed” on the planned slow-down of production for Typhoon among its European partners which has led to the latest round of job cuts, but insisted it would not impact the export bid.
The BAE chief said: “They understand the UK’s position in terms of recent events but I do not believe it has a negative impact. I think our partnership with Government is strong and a positive impact.
Note: The source got the figure very wrong wrt to the price of the Indian MMRCE tender.
For here: http://www.lep.co.uk/news/lep-business/typhoon_export_deal_will_secure_bae_jobs_1_3947195
BAE Systems, the world’s second-largest defence company by revenue, is not backing off aggressive efforts to clinch a multi-billion ringgit fighter jet deal with Malaysia, despite the latter’s decision not to purchase new military assets for now.
The UK-based firm hopes to persuade the defence ministry to buy 18 Eurofighter Typhoon fighter jets for the Royal Malaysian Air Force (RMAF)
http://www.thesundaily.my/news/201337
If Malaysia don’t want to dish out a lot of money for new aircraft, surely the RAF’s Tranche 1 Typhoons would be an attractive offer? Providing they’re not asking for too many aircraft multi-role capabilities, then, a very good buy for the RMAF.
In 2002 I thought it was quite a logical choice, but was rejected by the government for a paper plane (JSF), one of the reasons was the Typhoon wouldn’t be ready in 2012, and was more expensive than the cheap $30m JSF.
So they went with the JSF:confused: now we have had to buy 24 SH to tide us over and possibly another 24 soon. LOL
You couldn’t make it up really!!
They knew too well that it would’ve been ready by 2012 and more than likely to be cheaper too at this rate. (Remember, the US DoD really, really don’t like LM boasting the $65 million figure for the F-35 which suggests it’s going to cost way more than that). I reckon LM spoon fed the Australian government this nonsense from the beginning. They bitten, LM got the sale.
IMO it still is a logical choice to go with the Typhoon. If only the Ozzie government woke up. And lets also be honest, they’ll certainly have a hell of a lot more freedom with the Typhoon than they will with the F-35.
(Of course certain F-35 supporters are going to disagree & claim it’s superior in everyway possible blah blah…)
You never know what might happen in the end.
LOL I thought the same thing…
Someone should caption the Aussie saying ” Oh 8ugger!!”:D I’m sure I saw wet tear stains on his flight suit LOL.
Its like one of those family game shows ain’t it?
When the game show hosts says to the broken down contestant: “Sorry, you didn’t win! But lets have a look at what you could’ve won!”
Or worse: RAF pilot says to RAAF pilot; “You go up in your Super Hornet, I’ll go up my Typhoon, and I’ll show you how great this bit of kit is!”
(apparently B_u_g_g_e_r is a swear word!! oh ******)
So is c*ckpit and C*ck. (But depending on what kind of C*ck one means, be it the one with a helmet or the fluffy kind, it’s still a swear word.)
James May (Top Gear) wouldn’t be any good on these forums, would he. “Permission to say oh C*ck!”
LOL
But seriously though. I honestly reckon the Typhoon would be a perfect fit for the RAAF…
Pity…
Australia finally gets a look at the Typhoon..
There are two Typhoons on deployment to Malaysia at the moment. the pictures are here:-
If you look at the last picture on page 4 with the RAAF chappie in the cockpit, download it it shows the emergency flight instruments panel open its first time I’ve seen that.
Its the panel on the far right of the cockpit next the the right MFD it has a couple of analogue type dials in it.
Cheers
Thanks for those images, Jwcook.
I can’t help but think that the RAF chappie is saying to the RAAF chappie: “This is what you could have, mate!”
Shame…
If you ask me, everything seems to converge inexorably toward the Rafale.
I may be wrong, but It just looks as if the Rafale was the chosen one since the end of the trials and that the typhoon had just been added in the shortlist to pressure Dassault on the price and tot
That’s quite a bold claim you state there…A silly one at that.
Interesting. If the Pilum is offered in different weight classes it would probably make it a worthy alternative to the Paveway type bombs. Or is that a bit too early to claim?
The part I was curious about was which hard points would they be carried on. The two most outer A/A-A/G (inbetween the wet point & A/A point) would be handy and the centre station would also be handy, too.
If they’re ones in the 250-500kg class weights then there would most certainly be a good chance to carry up five of these cruise/glide missiles and still have the wet points free for drop tanks. And of course the six other hard points for A/A missiles. Not a bad weapons fit.
Might be too early to ask for such details but, is there any dimension details floating about regarding the Pilum cruise/glide missile?
I’ve had a look about but I’m none the wiser. Pictures alone are quite difficult to work out the size of it, especially when compared to Strom Shadow.
Reasons why, I’m just curious because I’m wondering what Typhoon stations it is able to fit.
Thanks in advance.
Woah, been a long time since I’ve witnessed so many posts being posted on the MMRCA thread at any one time for quite a while. I’d imagine it’d be quite a hassle to get a word in edge ways come 1st January, or slightly sooner.
@Swerve, thanks for the Typhoon figures wrt price you posted.
I’ve noticed a few members discussing the technical trials and whom came out on top out of the two shortlisted fighters. One must take into account the requirements for the MMRCA and although those letters obviously stand for ‘Medium Multi-Role Combat Aircraft’, despite this, India’s basic requirement still calls for an air defence fighter. Which indicates A/G is a secondary role, of which is still important.
One also has to take a little bit of a deeper look into the IAF’s requirements for the MMRCA and of where abouts they’d be based; i.e. at high altitude, north/north-east region of India – hot, humid & high conditions to operate in – and the potential threat(s) that could from around that particular area of the world.
During the technical trials it was no surprise that the Typhoon performed best in these conditions; I mentioned a few weeks ago (quoting from a hard copy of a source, not my personal words) that the Typhoon was the only fighter to perform take-offs, perform a display then land with a full A/A and drop tank load while only operating with one engine, in the conditions mentioned above.
With the IAF’s MMRCA requirements in mind; one could not be surprised that various sources (professional defence analysts) stated the Typhoon met the most of the 600+ technicalities out of all.
(Of course, unsurprisingly some Rafale supporters are going to claim otherwise on this, so. Believe what one reckons.)
Some might question the above & again, claim otherwise, but they came from the same group of analysts that predicted the Typhoon and Rafale had been shortlisted a few weeks before it was officially announced. The same lot also stated the Typhoon had an overall ‘favourable price.’ Predicting which aircraft would be shortlisted could be looked upon as a coincidence & very little, if anything at all thought of it. The ‘favourable price’ statement? Well, I don’t think anyone would have imagined the price difference of both aircraft to be so tiny, less than 5% (despite many Rafale supporters claiming the Typhoon price is much, much higher…And I certainly didn’t expect it to be so small, I must be honest) and Dassault’s words on the difficulties of meeting the offsets…
…Well, make of what one thinks of it.
Bluewings, what I said to you about lack of knowledge, common sense etc, I wasn’t saying you lack it in general. In general I’m sure you’re an intelligent chap, you speak at least one more language than I do for example. My comments were aimed at you stating claims about the Typhoon that were blatantly false or just plain silly, ones that were, or are quite easy to figure out or by simply looking them up. My comments weren’t a malicious attack on you, so please don’t take them to heart and sorry if they did.
But you know, if you’re not sure about certain systems, airframe design or whatever wrt the Typhoon. You just got to ask. Theres really no need to argue & claim against them for a few pages then realise; ‘Oh hang on? Yeah that’s right, actually.’ when someone has explained in great detail & provided some decent links to back them up. You’ve done this numerous times & theres really no need for it.
As for the rest; I’m not going to bother because it’s just going to end up like the same old, tedious discussions…
Thanks, Quadbike for the quote.
would make it as costly as the JSF. 😀
over the full production run unit cost for both should be around $ 80-90 million.
Yes, *thinking* I may have over exaggerated that figure. 😀
In one case the co-development will be for new projects: conformal side AESA antenas, GaN AESA, sattelite data link, AESA wave forming, data link and jaming, carrier version, nuke, new comon missiles, etc.
.
Most systems you mention come as part of the Tranche 3 package, Captor-E/GaN, DASS, communication systems, data links and jamming etc. The weapons would most certainly be that of European via MBDA of which India are showing an interest in.
A carrier version is of non-importance since the IAF don’t have any carriers and the IN are in the process of taking delivery of their Mig-29Ks.
Nuke capabilities are not exactly sought after since their MK1s and Mirages are capable of nuclear strike.
Typhoon & Rafale fans agreeing on things.
Has the world gone sensible ?
These things happen. Who’d a thought a thought a few hundred years ago both countries are to share navy warships in the next few years. 😉
Well, well, then being a native Englishman seems not to
include the fair-play and gentleman attitude that used to
be associated with your great nation anymore, does it?
Two types of people with opinions; those who have a respectable ones and those who have narrow minded ones. Unfortunately for your fellow countryman its the latter, so one can question why he recieves such flak.
You people ( all three ) also seem hell-bent on proving your
respective sides to be whinier than the other.
Give Bluewings a lesson in common sense & things might be a bit better around here.
SPECTRA and MMI are top notch versatile products.
Advantage Rafale.
That’s nice, top notch, advantage to the Rafale anyway…
P.S. For the umpteenth time, omnirole means all roles at
all times and multirole means most/all roles at diff. times.
Just the same as swingrole then, of which the Typhoon is considered to be, or shall be anyway. Both have something in common then. 😉
What 7.5 G super hornet there was a Boeing statement saying that the Super Hornet is a 9G airframe only limited to 7.5G for USN and that the Indian one will be a 9G fighter?
I don’t remember coming across any statement from Boeing saying the Indian Super Hornet would be a 9g fighter? Something I missed?
You are right its all technical and performance oriented and this is why I think strategy/politics won’t matter at the end either.
Be asured, they will matter.
Math? I didn’t know you were American.
Oh god no! If I was I would say I was Canadian. Girlfriend’s fault, she uses that term…and “semester”, and “Hi” & “Awesome”, so I kind of picked it up. Not good…Especially with a Geordie accent. 😀
£120-125 million isn’t flyaway cost, or production cost. The production contracts have all been for far less than that, & so have the export sales to date. India won’t pay anywhere near that for the aircraft. The Saudis paid £61.5 mn per aircraft, & although it’s never been completely clear what was in the contract, it seems to have been for more than just the bare aircraft. The Austrians originally contracted for 63 mn euros apiece including a 7% export levy, i.e. 59 mn euros per aircraft. Prices may have gone up since then, but not more than doubled.
Note that we’re bound not to sell them for less than our own armed forces pay.
Nobody tries to recover all the development costs from export contracts, unless the aircraft is specifically developed for an export customer, e.g. F-16E.
I see. But Saudi Typhoons aren’t Tranche 3 where as the Indian’s will be, if they select it. The £120+ million figure is something I picked up via various sources & just took note of it for future reference. But thanks for the insight anyway, Swerve.
So, what figure would one expect India to pay per aircraft wrt to Typhoon Tranche 3, roughly?
If this was the case the Super Hornet would have won this.
Nope. Unfortunately for the 7.5g Super Hornet, it performed poorly in the technical trials, so. Even if those benefits did play into it’s favour (which I very much doubted anyway), India would have been stuck with an aircraft that didn’t meet it’s requirements.