Not directly related to the IAF, but I’m sure they’ll keep an eye on this development as well. the pics are those of the NAL-ISRO-CSIR new regional transport, the RTA-70, that will include a number of private sector players as well in the development, including Infosys Technologies as well
…..
Diehl had displayed a mock-up of the cabin interiors for the RTA-70 recently.
So in a fuselage with a height of 2,3m, they manage to have a passager section with 1,90m height and a cargo hold 0,9m high?
Amazing!
Bit long there, guys. Start a new one if you please.
Zombiethread…
Snooaar…. snoar… time for a new one, folks…
Truly pathetic reporting.
For starters note that (even IF you believe the numbers) the PROJECTED cost groth is 57% and 89% yet the headline say “nearly 90%”.
The headline is absolutely spot on. It says “..up to nearly 90%”
Truely pathetic reporting on your behalf.
If the A400M tunrs out to be a good aircraft (1), if the C-17 line is closed (2), if Boeing really screws up the KC contract (3), if Lockheed screws up the F-35 contract (4), if the older Hercs get structural porlbems and need quick replacement (5), than maybe it could have a chance.
You’re being a bit optimistic for Airbus here:
(1) – Might well be. Remember that the C-17 used to have it’s teething problems, flying with concrete ballast in it’s cargobay and stuff like that…
(2) – The C-17 line would have been closed if it wasn’t for the export orders. I don’t see it last another four years.
(3) – I don’t consider it unlikely that Boeing screws up the tanker deal, if the Italian example is something to go buy.
(4) – Naaah, the F-35 program is running smoothly :rolleyes:
(5) – Already happening. C-130E’s are badly worn out, as are the older C-130H’s.
The Dutch wanted a number of modifications that Northrop didn’t want to approve. So instead, the NF-5 was built by and tested together with Canadair. Of course Northrop later more or less stole the slatted NF-5 wing and put it on the F-5E.
But why the F-5 at all then? Well, considering Northrop had already lined prince Bernhard’s pockets, there was little consideration for the fact that the military wanted something more akin to the A-4.
Norway didn’t have NF-5s, they had regular Northrop-built F-5A and -Bs.
The NF-5 was a specific version for the Dutch with a different wing and some structural changes made for the Dutch by Canadair. Second-hand NF-5s were sold to Greece, Turkey and Venezuela.
For what reasons Algerian (see in this thread above) and Omani (see links below) Lynx helicopters carries British roundels and serials ?
Factory test flights.
Boeing will deliver on time and within the price it promises. the KC-767 will also perform better than expected. there is no need to draw out the competition anymore. KC-767 has always been what the USAF wanted.
We all know you’re personally frustrated with Airbus, but could you just make a little less obvious?
…but I guess the cost of running eight massive turbojets must be a dampner on the whole idea.
Those eight engines (actually Kuznetsov NK-87 low-bypass turbofans) were only used all at take-off, to blow a cushion or ‘screen’ (hence the name ekranoplan) of air under the wings, to lift the beast off. Cruising would have been done on two engines.
It’s easier illustrated with the Orlyonok Ken posted a picture of; the two jet engines in it’s nose (two NK-8 turbofans) were for take-off, cruise was only with the big twin-prop on it’s tail.
For those of you concerned about the American taxpayer, don’t worry, Boeing will be under a microscope of this deal.
If Boeing ever wants another big contract…to say nothing of the follow-on orders…the planes will have to be perfect and delivered on time and on cost.
So… let’s bet a case of beer on that. From the three (on time/on budget/without glitches) I’m betting that Boeing will fail two 🙂
Was there competition for the A400?
Europe never pretended there was.
And of course those AMARG Sea Kings haven’t suffered from salty air either…
To be honest, it makes for a rather late attempt at competing with the Mi-8/17 series. But whereas you can find low-houred Hip airframes without much of a problem (plenty of former Soviet military machines which had a pretty quiet life), I doubt you can find S61 airframes in any decent nick.
Also, supplies for the Mi-8/17 are plentiful since those things are well established all over the world. Introducing something like the Sea King in Afghanistan just at the moment when they are beginning to see their long-awaited retirement in most of the worlds services looks like a recipe for a logistical disaster.
Ten or fifteen years ago it might have worked. Now i think it’s too little, too late.