@ww,
as does others. With the difference that they could go even faster in A2A configurations and if it is just by dropping their tanks, even they rely on them anyway.
@ww,
the F-35 won’t fly with M 1.6 on a regular basis either. The point is to be able to reach moderate supersonic speeds in a short enough time frame.
Back to the topic, certainly not the best flying display routine I have seen, but impressive anyway. There are some nice passages with TV being employed. The aircraft is also displayed at Farnborough. I hope we’ll see more displays quite soon.
Cola, JJ was trying to say that if it takes 2xF414s ($8.6mil) to equal the thrust of 1xF135 ($13.6mil FY2011). Therefore the F414 (2x at 44k lb thrust) cost is $195/lb vs the F135 (1x at 43k thrust) at $316/lb, a 61.7% increase in cost per lb over the F414.
Now the fun part. The F135 will continue to drop in price (the above mentioned 250th F135 will be in 2015).
And lastly, the F135 will likely have a lower SFC (.886 dry) than the F414 (.840 dry, double this for two engines = 1.680). This will lead to much lower fuel costs over the life of the engine for the F135.
Well the SFC is in fact higher according your data and the engine is less economical by that than the F414 or other contemporary designs.
13061 kg * 0.886 = 11572 kg of fuel per hour on max dry at SL
2×6300 * 0.840 = 10584 kg of fuel per hour on max dry at SL
In other words your single F135 consumes 988 kg more fuel, while providing 461 kg more thrust than two F414!
Oh an article from 19th July on 17th July:diablo: We can look into the future.
Anyway nice to see some progress in the one or other way. I’m looking forward to the proposed announcement at Farnborough next week.
By the way there will be a flying display of a fully loaded Typhoon (IPA5) at this Farnborough airshow.
http://www.eurofighter.com/eurofighter-world/airshows-events/farnborough-international/eurofighter-display-flight.html
Some shots from the practise demo at Warton has been posted at UKAR.
@jj,
well I have listed the supposed fly-away prices a couple of times now:
T1 = 53 mln € (German price without VAT)
T2 = 55 mln € (according the contract value for 236 aircraft)
T3A = 58-59 mln € (according Eurofighter)
Re.: T3A and upgrades from the F-35 News Thread II discussion
T3A isn’t fully defined yet. Up to date it’s only known that T3A aircraft will feature new computers and data busses, upgraded electrical systems and possibly ECS and full provisions for AESA and CFTs. The exact configuration has not been specified yet.
It has not be said in which way the T1 & T2 examples will be upgraded. The T3A contract just includes 2.5 bln € for such upgrades, which is a lot. I personally guess that this is for upgrading older T2 examples (block 8 & 8B) to the P1E standard (block 9). It might well be that some of the stuff from the P1E will make it into the T1 examples as well.
Up to date there isn’t much out about how T3A aircraft will be configured. It’s also not said that the T1 & T2 examples will be upgraded to T3A, just that they will be upgraded. Anyway this is the wrong place. If you want to know more, I’ll post in an appropriate thread.
The info was included in an article featured by a Combat Aircraft issue. I don’t have it at hand yet, but in another place. If I’m there I’ll look up the issue number/date.
At least a hint to that info is included in this article:
http://www.aviationweek.com/aw/generic/story_channel.jsp?channel=defense&id=news/TRANCHE073109.xml
The €9.1 billion includes €1.4 for the engines, as well as a large funds to address block obsolescence, says Enzo Casolini, CEO of Eurofighter.
In that CA article I refer to 2.5 bln € was mentioned for upgrading the T1 & T2 aircraft as mentioned above.
yes the t2 was wrong, it was the t3 he said was 58-59m, i guessed he was talking pounds and not euro’s as we were talking UK and said ~60m pound, it obviously wasnt the 67m pound contract price
~ = about
ok, all you need to do is a NETMA link to your claim of 42m
And why do you guess that I meant pound when I wrote Euro (€)? The 58-59 mln € figure per T3A aircraft was reported by Jon Lake and the source quoted was Enzo Casolini, CO of the Eurofighter GmbH.
The 9.1 bln € T3A contract figure includes 2.5 bln € for upgrading T1 & T2 examples as well.
59 mln € * 112 = 6.6 bln € + 2.5 bln € = 9.1 bln € the quoted contract price!
but even worse case scenario, it is 70m pound flyaway
the T2 EF is ~60m pound and T-3a would be dearer
and only a fool would say ef is better value
For someone who claims…
flyaway is the only price that can be compared and even that has to be closely looked at
…you are quite quick in presenting numbers without looking close enough for the details. It’s also funny to see you claiming 60 mln $ for the F-35A is fact, when no contract has been signed for the aircraft at that price, while ignoring the very real facts that the Typhoon’s contracts are signed at a certain value. This has been previously discussed a thousand times, but there are still people who simply ignore facts and make up stuff to bolster their pointless points.
I thought that GB paid almost 70 mln £ for the Eurofighter.
This is not the fly-away figure. When the T2 contract for 236 aircraft was signed on 14th december 2004 it was valued at 13 bln which makes an average 55 mln € per airframe. A German government request asked for the price of the “current” Luftwaffe Eurofighters and the answer was 57 mln € with VAT and 53 mln € excluding VAT. The T3A price has been quoted with 58-59 mln € according Enzo Casolini the Eurofighter GmbH CO. It’s important to take into account what is included in the price. Dunno whether the F-15SE price tag includes anything else bare the aircraft with its systems.
No, but the Eurofighter and Rafale are also more exspensive and less capable.
Are they? 50-60 mln € doesn’t result in a >100 mln $ figure these days and that’s about the fly-away price range for the two European fighters.
@Pioneer,
the original LFI programme was cancelled in 1992, but a new programme was launched in 1994 this was dubbed LMFS, but got cancelled as well in favour for the PAK FA programme in 2001. The Russians didn’t have the funds to pay for both projects, PAK FA replaced the MFI programme which was ceased in 1997.
The designation MiG-33 has been used two times now and MiG attempted another reuse of this designation. I’m sceptical that they would use this designation once again, especially for a new type after the MiG-35. But the Russians will have enough to do anyway to develop and field the PAK FA, so don’t hold your breath. It has been stated that there will be a hi/lo mix comprising PAK FAs and Su-35s as well as MiG-35s (though the latter isn’t yet on order).
Nice up to date article about the Gripen NG programme here:
http://www.flightglobal.com/articles/2010/07/13/343778/farnborough-saab-plots-bright-future-for-gripen-programme.html