Which only add more questions..
How many Prototype or testbed will participate in this 2000 test flights?
Surly not a singel aircraft, they need several to do that.Thanks
As mentioned before there will be 6 prototypes, including 3 flying examples, 2 static airframes for structural load and fatigue testing and a non flyable airframe for ground & systems testing.
Like Sign said what I do not understand is how the Typhoon one of the darkhorses became favourite overnight ?
The only logic i see behind it is a need to buy a plane without American parts. Mig 35 would make India too dependant on Russia and Rafale is so darn expensive.
Rafale isn’t more expensive than the Typhoon, in terms of fly-away cost it might be even a tad cheaper. Who says it has become the favourite over night, maybe there is just something surfacing now. Maybe the Indians know a bit more about the various contenders now, or maybe its just a political move or whatever. So far there is no indication of a definite winner.
@PeterG,
the Luftwaffe has only a few AIM-120B, that’s one of the reasons you rarely see them carried by the aircraft. The intended purchase of AIM-120C-5 has been abonedoned and the Luftwaffe intends to opt for the Meteor directly.
Luftwaffe Eurofighter’s have the rear MAWS, just the twin seater lack them and some early T1 examples and 3 T2 examples were delivered without DASS at all. The TRD being used is the Sky Buzzer from EADS, other Typhoon’s use the Ariel from BAe.
The image posted by Spduman is from spring 2009.
@HAWX Ace,
the Paveway’s aren’t used by the Luftwaffe. The aircraft shown is IPA3 which conducted trials in support for block 5 development. There are also images of IPA7 carrying PW IV in support for the P1E development.
Things are not getting better…
Here is a recent Pentagon report.
http://www.cdi.org/program/document.cfm?DocumentID=4588&from_page=../index.cfm
* The F-35 assembly line at Forth Worth, Texas is being cannibalized for parts to support flight testing. This may be the first time an assembly line has been cannibalized for parts. See the summary of the August report below.
* The continuing and sometimes deteriorating nature of the delays at Lockheed-Martin’s (L-M) Fort Worth plant refutes the L-M contention that things are getting better, and that the F-35 program learned from the past and with new design techniques is avoiding the kinds of problems experienced by “legacy” aircraft programs.
* The cause, nature and implications of the “stand-down” mentioned in the November report could well be important, but are unreported by the press and are a matter looking for explanation.
ECM suite?
SPECTRA is the most integrated suite to this day, and the british have nothing comparable ready in any near future
Ehm DASS? I would consider this system not much less integrated or capable at all. With regards to an RN Rafale integration of the DASS would be problematic however.
Arthuro, I am a native English speaker but the translation of the Armasuisse report is incomprehensible to me. Do you have the URL of the report in French or German, please?
Try this one in German:
http://www.nzz.ch/nachrichten/schweiz/armasuisse_will_mit_neuer_variante_den_kauf_von_kampf_jets_retten_1.5040402.html
If you need help for translating parts let me know.
Luftwaffe reacts on shortage of Eurofighters
Not really news for me, but it’s official now.
The JG 74 will sent most of its aircraft and some of its personal to Laage AB where the JG 73 OCU is based. It is planned that personal will be transported to Laage with Transall aircraft from next Monday and that they will be moved back to Bavaria on Friday and this will continue for the next few month. It is planned that training of the JG 74 personal is conducted at Laage as the Luftwaffe units have a shortage of aircraft. According original plans the Luftwaffe should have had 91 Eurofightes at the end of 2009, but just 49 aircraft are delivered so far (the article mentions 48, but there are 49). Not all of them are available either due 400 h scheduled inspections and the R2 upgrade etc. All overseas exercises are cancelled except for a single deployment to Deci. The Island QRA duty will be taken over by the JG 71 with its F-4F. A decision how to continue will be made in October. Until July it’s planned to fly with 3 waves a day à 12 aircraft.
Re AMRAAM on Falkland Typhoons
Check out the few images posted here by Bootneck in post #320:
http://forum.keypublishing.co.uk/showthread.php?t=91645&page=11
At least 2 AMRAAM visible on the Typhoon.
Read that too, but it’s quite some time ago now. The RAF has probably received around 67 aircraft (Excluding IPA1 & 5) or at least so many aircraft has been flown up to date and the AMI 35+ with possibly up to 44 aircraft being flown by now (+IPA2), but I have no exact numbers.
The Spanish Air Force has amounted 10000 flight hours and has received 28 aircraft so far.
http://www.eurofighter.com/news/1000SpanishFlyingHours.asp
The Luftwaffe has formally taken delivery of 49 aircraft up to date. No idea about the RAF and AMI or RSAF for that matter.
Sens,
I agree that the two programme don’t compare well as there lie some 12 to 13 years in between them, if we take the formal launch of both programmes as the starting point. They were conceived under very different circumstances and with an entirely different military threat situation as I tried to indicate with my statement:
“but it didn’t had to overcome such huge political changes on its road”
Where I have to disagree is that the Eurofighter was meant to be a pure fighter. That’s nonsense we had discussed a thousand times before. Even the TKF 90 proposals from MBB, VFW Fokker and Dornier were for a multirole fighter with a primary AA role and a secondary AG role to complement dedicated assets such as the Tornado IDS and Alpha Jet. Let alone the RAF’s requirement to replace the Jaguar and the EdA’s interest in a multirole capable design. What happened after the end of the Cold War was a shifting emphasis towards more AG capabilities. The AG capabilities weren’t really a cause for the delays in the history of the aircraft, as it entered service in a pure AA configuration as planned from the very beginning.
I have to agree with Spudman, the EAP was a tech demonstrator like the X-35, though there is the difference that the EAP was never officially linked to the Eurofighter programme unlike the X-35 which was officially linked to the JSF programme.
Where I have to disagree is the ECF, if we go that way we could also include CALF & JAST to the JSF programme and first USMC/RN/DARPA/Lockheed studies for a supersonic STOVL Harrier replacement root back to the early 80s. That’s not exactly the JSF however. The F-35 is definitely progressing comparably faster than the Eurofighter programme, but it didn’t had to overcome such huge political changes on its road and is largely a single nation programme with some foreign participation. Even without the partner nations the JSF would have been develope, this couldn’t said about the Typhoon with a partnership of equals.
Likely it would be interesting to know where the other two arrays are. The wings leading edge was previously suggested. And what about the tail?
The latest issue of the German aviation magazine FlugRevue features an article about the PAK FA.
It states that the Al-41F1 engine powering the prototype generates a reheat thrust of 147 kN. Any other source which confirms that?
It furthermore states that there will be 6 prototypes:
T-50KNS = not flyable prototype to be used for taxi and ground trials
T-50-0 = Static airframe for structural load testing
T-50-1/2/4 = Flying prototypes
T-50-3 = Static airframe for fatigue testing
It is stated that T-50-2 is scheduled to conduct its first flight at the end of 2010.
Come on! Seriously???
Right here and for the Xth time :
from here first :
And there f..k :
IN DEGRADED VERSION, four on four, the Rafale got scores of
4 to 0 and three to one.No wonder these fora are so painfully boringly repetitious.
Personally, if i had the attention span of a squirrel with ADD
and on crack, i’d take notes!Sorry but really………
Good day all anyway.
I see, sorry did got that as I haven’t followed this never ending discussion for some time now. “Degraded version” still sounds odd and tells us nothing at all. So far we know that generic missile ranges were agreed and that’s it.