    what is left to do before releasing the Paveway IV for operational use on the Typhoon?

    Clearing the standard on which the PW IV has been trialed for service. PW IV is not supposed to come before P1E A. Possibly called block 10. The initial tests were flutter trials only and the first drop was just recently conducted.

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2363521
    Scorpion82
    Participant

    I don’t think so, PW IV isn’t cleared for the current aircraft as they are in service. It would require new software uploads and possibly more than that in order to be deployed. So expect those aircraft operating with PW II & EPW II.

    in reply to: MMRCA News And Discussion 7 #2364021
    Scorpion82
    Participant

    No one denies that the Gripen features a lot of foreign components, more so than any of the other two European fighters. It’s radar isn’t entirely Swedish either, but partly with British technology which would be subject to export clearances from the UK governement, but the UK already gave its go and stated that it wouldn’t veto its export.

    That being said I keep the CEO’s words in mind, but won’t take them for face value until there is some reliable evidence. I agree that there are a lot of parts which form a radar the LRUs are one thing, then you have the SRIs. Of course it is possible that the one or other component may be supplied by a US company, but as said there is no evidence to prove that. I don’t think anything must be add to that.

    Back to topic does the announcement of the short list still stand for the near term?

    in reply to: MMRCA News And Discussion 7 #2364053
    Scorpion82
    Participant

    Well it could be in theory, but up to date there appears to be no evidence for this. Maybe some of the Gripen followers may have some info on it?

    Thus far I wouldn’t take Mr. Edelstenne’s claim at face value.

    in reply to: MMRCA News And Discussion 7 #2364108
    Scorpion82
    Participant

    For the “american radar” you can’t say it is a mistake in the sense the hyperbolic statement was on purpose. I don’t think you can say it is a subjective POV. Either it has US parts either it has not. As a important stakeholder in this competion he must know for sure. Or he is not qualified for his job. There is no point of making misinformation/confusion as the results of the real are know by specialist that could not be fooled like this…

    Edelstenne must know nothing about the competition in the first place and that officials spin stories often enough isn’t new. Fact is it’s just a claim, but no prove. If he had talked about the Rafale I would say ok he should know, but he is talking about a competitor and likely wants to make a point. Maybe he has just confused something and it wasn’t an intentional error, possibly he thought that the radar would be using an AESA from Raeython or whatever. Taking this claim for facevalue with no proof available is somewhat naive.

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364185
    Scorpion82
    Participant

    Ero_Senin has a point. While his views are in some areas a little bit exaggerated or inaccurate, the main point is true. The Eurofighter programme structure and management were and still are very inefficient. Virtually no critical decision has been made on time due the lack of support and commitment besides one or more partners at various stages of the programme. There are a lot of unnecessary redundancies among the partner nations which make things complex and add to the cost. The production run isn’t that large to justify 4 assembly lines and that different companies produce parts for even minor systems isn’t efficient either. The reasons for that are political and also forced by industry so that everyone gets a bit more from the cake. But is it really necessary to let 4 companies produce parts of a single computer for example?
    The slow decision making process has caused the waste majority of delays, which in turn added to the cost and the aircraft could have been farther developed and cheaper by now. The time last can’t be made up and money sunk can’t be returned, what’s left is restructuring the programme management and arrangements for the rest of the programme. At least on the support/logistics front advances are made and they appear to bore fruits. The operational costs are being reduced by enormous amounts (up to 50% savings!). The fact that the partner nations are largely cash strapped and still unwilling to invest is a major stumbling block however, as it has ever been. Wrt the T3, “only” part B is at risk, not part A. I also don’t see the market to be flowed with T1s, spare perhaps the British T1s which are to be retired in 2019 according current plans (who knows what things will change in the future with potential further delays of the F-35 etc.). Italians insisted that they would trade T1s for T3Bs, but that’s probably not going to happen. Neither Germany nor Spain insisted that they would like to sell their T1s and neither has Austria.

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364408
    Scorpion82
    Participant

    How are things going in Saudi Arabia?

    How many a/c did they receive?
    Were they delivered according to schedule?
    When will they build the assembly line?
    And are they happy with their Typhoons?

    Thus far 20 aircraft have been delivered and deliveries appear to be on time. There is not much feedback however, at least not public.

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364482
    Scorpion82
    Participant

    For now the industry continues funding of the AESA, that doesn’t mean there will be no support besides the partner nations. The BWB already sponsored the CAESAR trials campaign onboard DA5 back in 2007 and the UK MoD is funding another AESA Typhoon demonstrator (contract awarded to Selex Galileo in February 2010). Even if the Industry has to fund full development, it doesn’t translate into “other countries have to pay for it or it won’t be developed”.

    Wrt T3B it was stated that the contract must be signed until May 2012 (albeit targeted at the end of 2011) to ensure uninterrupted production and delivery of T3B aircraft by 2015. IF they would sign a contract in 2013 or 2014 deliveries would could begin around 2017. I personally believe that they may extend the T3A in fact to satisfy potential international customers if there will be any in the future. The lack of commitment and funding is a clear stumbling block, another one I may add, which may prevent Eurofighter from securing more orders.

    in reply to: Rafale's RBE2 AESA pic and news! #2364497
    Scorpion82
    Participant

    B) -the first ever (P)ESA fighter radar was on a Russian plane;

    Just a minor correction for you;)

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364501
    Scorpion82
    Participant

    Nothing of that sort is stated in either article! Neither that export customers will have to pay for the AESA, nor that T3B will be postponed beyond 2020.

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364555
    Scorpion82
    Participant

    Nearby:diablo:

    in reply to: Eurofighter Typhoon News & Discussions Thread IV #2364571
    Scorpion82
    Participant

    Drop tank update

    The investigation of the incident where a Luftwaffe Eurofighter has “lost” its wing tanks during a training sortie concludes that it was caused by a pilot error.

    in reply to: MMRCA News And Discussion 7 #2364583
    Scorpion82
    Participant

    You’re getting too obsessed with that *better than* detail. As far as I know, rather than the best design of all the IAF wanted to pick the most affordable design that meets the requirements. Has that changed?

    Obligatories original assertion in response to GPs claim the Rafale performed best during the eval was that he has got a different version and posted the text passage which didn’t match with his assertion. Call it nitpicking, but it was merely an outpointing of an inaccurate assertion. Not more not less, I don’t bother that much about the “which is the best part”.;)

    in reply to: MMRCA News And Discussion 7 #2364795
    Scorpion82
    Participant

    Lol another version? Isn’t that from that lengthy report “dogfight”? And where does it say the Gripen performed best? It’s just stated that the Gripen comes closest to the original requirements which were centred around the M2k. Does it speak for or against the Gripen? The initial text is just bla bla from the Author himself.

    in reply to: MMRCA News And Discussion 7 #2364806
    Scorpion82
    Participant

    Indias ridiculous joke story known as MMRCA continues…
    http://www.defense-aerospace.com/articles-view/release/3/124272/india-to-pay-%241-bn-for-extension-of-mmrca-bids.html

    The commercial validity bid phase has been extended and is likely to cost India an additional 1 bln $!