Merlin AEW?
When did this happen?
First i’d heard of it was a couple of day ago. Still not sure if the MOD has asked for it or if AW went ahead and did it themselves. Either way they’ve been very sneaky.
Please, please!
But it’s vapourised. You’re not Leftpondian!
Eep sorry, it’s my damn browser spell checker, it doesn’t appear to have an English setting.
@haerdalis: Are the bays plumbed for fuel tanks? And have the created a stealthy pod yet?
How far is it over the target empty weight?
Haven’t seen any figures recently but the last figure I saw said payload was down from 40 to 32 tons, I don’t think they stated how much was due to the increased empty weight.
One question that keeps bugging me, why are the USMC and UK F35Bs different in their performance characteristics? They are supposed to be the same plane. I understand why their performance targets may be different, but not the actual performance characteristics as indicated in those tables.
Logistics footprint for example, why does the UK seem to have a heavier footprint for maintaining the same aircraft?
And i’m definitely going to try and see QE when she’s launched. On a similar topic, Merlin AEW should have been unveiled today shouldn’t it? Anyone have any pics yet? (I still don’t know why I didn’t drive down to the Air Day, it’s only 30 miles from me :S. But on the up side they do training flights past my house so I may get to see it in flight soonish).
It could mean one of several things, but it may have just been to test the ability to quickly move more TLAMs into range of North Korea. It might not have been aimed at China at all. But then it could also be say to China “Nice new missile you have there, but I wouldn’t get to cocky now you think you can shoot our carriers, because we can still make you miserable.”
You need a tanker able to fly slow enough for helicopters to keep up. That means no jets. As well as the KC-130, the Transall can also do it, & the A400M will be able to.
So until the A400’s come in my statement stands, the UK can’t refuel helos. And then as has been pointed out the PFI will need to be shot twice in the head and then vaporised.
its amazing how time flies! i remember thinking Starstreak was amazing, but that was what, 15 years ago?
Is the system totally for the chop then?
They released an improved version called Starstreak 2 back in 2007. No idea whether it entered service or not though.
Doesn’t the RN has some capability to refuel aircraft using helicopters?
Using a helicopter to refuel other aircraft or getting a helo refuelled?
Either way, no. You need KC130s to refuel helos, other tankers can’t, the UK doesn’t have any. And i’ve never heard of a UK helo able to refuel others.
What are the differences between the A and C version? Couldnt the program have saved money by using the C variant for land operations as well? With all the extra customers for the C variant, the unit cost would have reduced significantly.
We see carrier foghters operating from land all the time, so whats the problem?
@Liger: Thats what he was saying.
If you would care to refer to the first reply of this thread, I was the one who used the phrase saying they were only “nice to have” and went on to say that we were unlikely to purchase them now. They will have some uses, but not enough that we can afford to spend money on them now.
The RN/RM alone? As in not the army and RAF or not coalition allies? The initial stages a re-invasion of the Falklands would be the best example of when Swerve’s scenario might be needed.
Well the indication is that we’ll be heading down the path of strategic raiding and public support is a lot less likely to go for any more invasions any time soon so it may well be that the next time the nation needs to play hardball, the only semi-acceptable way to do so would be to attack without invading. That could easily mean just the RN using TLAMs and F35Bs depending on the location. Theres also the possibility of a quick in and out ground strike where the RMs (and maybe special forces/paras) move in without any intent to stay, so setting up an airbase is less feasible.
Perhaps I should have been clearer. Yes, we’re basically saying the same thing, but when I say that Mantis does not need to be piloted, I’m saying it does not need someone who is qualified to fly an aeroplane. The USAF uses pilots – officers who have flown aircraft – to operate Reapers. The British army thinks NCO specialists, who’ve never sat in a cockpit, can operate UAVs. Mantis is designed to be operated by the same sort of operators, although it’s being offered to meet an RAF requirement.
AFAIK the Herti demonstration in Afghanistan showed it could be operated in British army style, although supported by the RAF. It’s interesting that the unit publicly (on its website) stated to have supported the Herti demonstration is an RAF reserve photographic interpretation unit, 7010 squadron, which fits your speculation.
Also impoirtant to note that this is also how the US Army operates their UAVs. Interestingly they had fewer landing accidents than the US Air Force because they allowed it to be automated rather than having a pilot do it, which led to the USAF changing their procedures to allow more automity.
Back to the main CVF focus… i saw on today’s press that speculation continues on pooling carriers with the french. Can someone tell the reporters that the french couldn’t fly their Rafales from the QE’s decks just as the F35B wouldn’t be able to operate from the CdG…?
Because to “share” carriers as they say, the point comes always down to catapults. If capatapults aren’t fitted to the ships, there’s no possible sharing to be made.Anyway, i read the statements of the First Sea Lord at RUSI, and he made an excellent point reminding another interesting data, the fact that most capital towns in the world are within 150 miles away from the sea and that soon 65% of the world people will live in this coastal area as well. This fact alone widely justifies the aircraft carriers.
Liam Fox keeps talking about “forces” less focused on heavy and more on firepower… What the hell does he mean, it’s very unclear to me. But in my eyes, these statements all but justify the funding of the carriers. In particular, the famous “not wars of states, but wars of people”… with 65% of the world’s population living near the sea, carriers are the key.Thus, i hope that the press is widely wrong when they constantly say the second CVF is at risk. It would have no sense at all to scrap it.
And it would make no savings. Not in the next few years. It would merely make the single QE as expensive as the new USS Gerard Ford without being as capable. It would be demented over any limit.
It won’t happen anyway, the press is just being its usual useless and ill-informed self. But FYI F35B could operate off CdG, nothing to stop it.
Scavenger is considered an element of Project Solomon, which apparently is the new codename for what was called Dabinett. This is an over-arching ISTAR programme, including other platforms such as satellites. Perhaps more will be learned on Monday.
Can you be more specific on the satellite part? Is that just for Comms or actual surveillance. I always wondered why the UK never bothered with surveillance sats.
There is room in the A model for the probe as some partner nations requested it.
Only on the A?
That kind of makes this entire discussion pointless then if the B cant refuel via a probe and drogue system.
Regarding UAVs, yes you do still have to worry about a crew. They’re unmanned air vehicles, not autonomous air vehicles. Whether the crew is onboard the carrier or somewhere in an office in Portsmouth is a different question as you’ve still got to have someone watching the radar picture. I would ask whether, assuming technical feasibility, using UAVs means we have to start thinking about bandwidth and possibly putting another comms satellite in orbit?
Mantis is meant to have a very high degree of automity built in to it. And if the pilots are in the UK or on the carrier then you don’t need to worry about them dying on the mission compared to a FJ pilot. Depending on how they’re operated, they may not even need a fully qualified pilot to fly them, which saves money.