What an indolent load of claptrap.
Support helicopter…presumably for theatre deployment?. How are you pray tell supporting your theatre deployment logistically?. By air….dont make me laugh. Tankers….aah yes as in the AAR effort required for Black Buck how many aircraft were required to put those 21 bombs on target at 8000nm again?. 20 or perhaps 30?. SEAD when your longest ranged striker is pushing it to round trip attack Akrotiri???.
Behave yourself. Without local base-in the RAF is as toothless as it was in 1982.
The carriers are essential for global presence and no amount of light-blue wishful thinking is ever going to dispell that.
Words spoken by a person who is clearly one of the few on this forum capable of understanding the link between policy, doctrine and procurement, exceptionally well put.
Yeah I forgot about that, but I still think a full joint carrier project where a contract had been signed dividing up workshare and systems/equipment jointly decided and procured may have helped France continue with PA2. It would have made it extremely difficult for the French Navy to specify a higher level of equipment fit that pushed up prices and moved away from what both countries were trying to aim for (ie. keeping costs down) or postpone it. That’s why I still think DCNS have a valid point. But it just wasn’t going to happen like that and would have needed a lot longer timeframe to get to that contract. On top of that, and what I also forgot, concerns were being raised in all three services because they knew other projects and capabilities would be canned to finance PA2. Seems the same concerns are now starting to be raised here.
Blaming Britain is ridiculous, is it also the fault of the UK that the French Navys FREMM order has been slashed to 11 units? Or that the French FREMM’s will have less structural integrity compared to their Italian counterparts?
The French knew what the British were building and on what time frame, the British time frame had already slipped as it was, if the French Navy was too arrogant to stick to something similar that is not the fault of the UK.
This is just politics, it is no coincidence that this was released at about the same time that the decision to agree the Anglo-American defence accords was postponed on the US side. The RAF needs F-35 and so does the navy, it is not going anywhere.
Submarine acoustics are not common knowledge. LOL.
Not to you, or anyone other than a very select few people.
Not that select.
Demand was probably the wrong word to use, but the block “suggestions” that were floated (and allegedly submitted to the MoD with backing from the French government) would have still been quite a hefty amount of work (I think it was about 40 per cent). The DGA had publicly gone on the record that it wasn’t happy with what France was getting out of it industrially and that the original proposals would make PA2 too expensive. On top of that, various other ideas were floated, including joint manufacture of the propulsion systems, and at one stage I believe that construction at St Naizare was actually suggested.
From the British end, it had more than a whiff of the Horizon fiasco. Yes, it probably would have made economical sense, but it was a non-starter. Besides the UK was already moving on with the project and starting to order lead-in materials from late 2007, including for the propulsion systems. Workshare had already been decided and all that was required was that the manufacturing contract to be signed that was endlessly being delayed. It was pretty obvious that something was going on at France’s end on PA2 by then, long before Sarkozy announced that it was postponed in May 2008.
Personally, I don’t think DCNS (Poimboeuf) have made any silly statements and it is quite a valid point that has been made. A lack of co-operation on the British side (ultimately because it would not let France have what it was asking for in terms of industrial share) made it easier for Sarkozy to postpone PA2.
Anyway, getting back to thread. Maybe cancelling the CVFs and F-35s together would be the better option.
Dude, the french wanted one carrier the British two, they did not deserve 40% workshare. the real reason for PA2’s collapse (beyond the pathetic blame someone else whining) is probably anchored in the excessive equipment fit being sought by the French navy.
If you want a carrier find the money and pay for it, otherwise get over it.
That may well be the only operational example, contractual problems forced a delay to the program a couple of years back after only one boat had hit the water with two more in construction, if anyone has an update I would love to hear it.
Commone knowledge? U cannot even find signature of Diesel SSK late alone. They maybe deceiving the other side by creating noise. so stop making any claims.
Amur signature is several times better than Kilo available for export.
You know you dont get replies out of me because of your racially motivated bias and pidgin English so dont bother making your absurd comments in response to me.:mad:
Based on your star spangled banner waving? :rolleyes:
Based on common knowledge.
yeah sure u have. We all have
Believe what you like sunshine;)
Thats your opinion :rolleyes:. Unless you can back it up with sources/reports it does not count more than my opinion.:D
I have had it ‘backed up’ inumerable times by people who know for a fact.
Until the Seawolf and Virgina boats were introduced i think they on par. We will just have to wait until Borey and Yasen finally get out to sea, and maybe 10 years from now we will read about it. It is meaningless talking about what sub is most silent, neither you or anyone else can prove anything. :rolleyes:
Partially true, but all the wet dreams about super quiet Russian boats bettering Sea Wolfs and Virginias are all based on the absurd, flawed and wrong assertion that seems to have appeared from nowhere that the Victor III equalled or surpassed the 688I. This is simply not the case and has never been so.
PS to all re unsuccessful Bulava test:
My own latest info is that the latest test involved 3 warheads, 1 of them was a new type of MARV with new self-sustained propulsion and it partially failed to follow a pre-programmed flight path due to a last-minute command download failure from the bus (that suggests that the Russians are experimenting with a in-flight command and targeting system for warheads, similar to what the US does with the latest Trident warhead iteration). That should be the source for the “failure rumour” reported by the Kommersant. But do not expect Podvig to report that 🙂
Source?
Pic looks photoshopped.
Thats because they are artists representations.:rolleyes:
Fighter Mafia at it again..
The above article has been copied and pasted from JDW, and the original was followed by a powerful rebuttle from industry leaders.:mad:
Yeap. The problem is the SIZE of the inaccuracy. When you mix serious analysis with wishes, such a big error arises. 🙂
Now you are clutching at straws.:rolleyes:
Just compare the real SS-25 withdraw-rate with the Podvig-forecasted rate. This is the reliability of his forecasts. Off course, if you want to believe him, there is no problem. The problem is that reality is in other place.
It is called a forecast, by their very nature they are inaccurate.:rolleyes: