dark light

JSR

Forum Replies Created

Viewing 15 posts - 3,001 through 3,015 (of 4,319 total)
  • Author
    Posts
  • in reply to: Potential Syrian War – no fighter involvement? #2255625
    JSR
    Participant
    in reply to: Potential Syrian War – no fighter involvement? #2255983
    JSR
    Participant

    Any Syrian intervention without UN pushes that organisation further down the same path as the illfated League of Nations in the 1930s.

    And it does make other conflics more likely, especially as the US military juggernaut slowly loses its teeth over the next few decades.

    This might be great for the Fighter X versus Fighter Y crowd as we might actually see A2A combat in the 2020-40 time period!

    2020-40 is too far. i think some where around starting 2015.

    in reply to: Potential Syrian War – no fighter involvement? #2256517
    JSR
    Participant

    Also no-one wants to take sides too strongly in Syria due to:

    why take sides at all if your not taking strongly and create precedence for other?.

    http://www.washingtonpost.com/world/middle_east/russia-says-western-attack-on-syria-would-be-catastrophic/2013/08/26/4a7ea122-0e5d-11e3-a2b3-5e107edf9897_story.html

    He accused Western powers of ignoring international law at will and treating other “civilizations” as second-rate. “The tide will turn one day,” Lavrov said

    Oil prices have risen and emerging markets in route. I am sure Russian would enjoy throwing cruise missiles at Middleast and make oil price to stratosphere. i think it will accelerated rearmament for Ruaf. Saudis could also buy some new toys but most of there new found money goes into consumptions/corruptions rather than real capability. only 24 EF in operations. but i doubt they are going to order Rafale.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2256874
    JSR
    Participant

    To bad they are planning to do it, and the Indian defense minister expects it to happen. But than again, what do the Indian defense minister & Dassault know about the MMRCA.

    you want to bet on this one. Rafale for India is far off.

    Despite of this, it was held to be superior to the Mig-35. And the Rafale AESA has been mounted on a in service jet, and will be offered for the MMRCA to start things off. By the time IN actually needs to decide, they would have had a chance to look at many squadrons of AESA_operational rafales with their IAF counterpart.

    corrupt nature of deal is making all this delays.

    Show me the missile and then we’ll talk. 3-5 times the range of Meteor? How many of these missiles can the Mig-29K carry?

    MIG-29K can operate 4 Kh-31. There is no reason it cannot operate RVV-BD which is lighter missile.

    I merely expected you to point me to a chinese missile, that will make the Meteor obsolete. Since you insist of talking REALITY, i expect such information

    so you expect Chinese missile will be inferior to EU missile when Chinese have funding of supporting mulitple figher projects, independent human space missions and will complete its satellite constellation far ahead of EU. There is big difference in funding and technology level. These things will be obvious each year. and by time India gets Meteor. It will be practically obsolete for want of funding.

    The IN has not ever initiated a competition to pick the next generation of fighters for its upcoming carrier developments. The Russian carrier came with the Mig-29K’s. The IN can wait for a few years still before initiating a demand for their new carriers (for the future). I do not expect them to go without competition for a fighter decision that is likely going to be backbone of their fighter fleet for the next 3 decades.

    I am pointing to the India 2nd Carrier for that MIG-29K.

    Whats the difference between a regular contract and a paper sketch contract? 300 million is insignificant? And why would you pay 5.5 billion USD for a stage of development that has not even begun? India was expected to pony up the cash after the PDR phase, which they are going to do. Why would they have done so earlier?

    I mean current flying prototype has no India funding. once that sketch is converted into actual prototype than we can talk about India funding.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257131
    JSR
    Participant

    The rafale is operational with the french. The Indian defense minister is on record, in the Indian parliament to say that the first rafale squadron would be operational within 3-4 years from signing the contract. The french have already begun making a room in their production line so that they can meet this deadline. The only way the rafale would take 10 years to be operational is if India takes 7 years to sign the contract. The Indian navy, does not need to procure any new fighter at the moment. Their fighter needs are well taken care of with the russian carrier coming online and the mig-29K’s already in operation. The decision on procurement would have to be made when decision on IAC 2 and 3 are made. Then the IN would have to look at whether they want EMALS or not, what size carrier the want, and whether they do want to have a formal competition to pick the best fighter available in the market, or go on and buy more Mig-29k’s that they procured due to compatibility issues with their russian carrier purchase, and that never formally was a part of any competition. At that time, Indian navy would also have to look at their budget and see whether they want to go for a 5th gen option (which i would recomend) or a 4.5 gen option. The rafale would give you the advantage of having a production line already in India, whereas the F-35B/C would either have to be procured out of fort worth, or TOT arrangements be worked out and a line set up in India. All in all it would come down to cost and how much the Indian Navy budgets for its carriers. I just feel the Non-EMALS option would save a lot of money, and the F-35B does sound a very good option around 2025 when both the IAC and IAC2 are going to be operational together.

    Your still making the same mistake again and again. EF that has more active production line will deliver first aircraft to Oman in 4 years. Dassualt simply cant do that for Indian specification Rafale. unless India accept French standard Rafale.

    Rafale AESA is already in LRIP, and mounted on an in service fighter. The production process is in motion, and would look to speed up given the size of the Indian order.

    Rafale AESA could not operate weopons during MMRCA trials. it is not a production process but lab process.

    Only you are claiming that the Meteor would be obsolete within 4-5 years of declaring IOC. Do point out which chinese missile would be superior to it, that would be present on the J20/31 as you have suggested.

    Meteor is missile that is in development for past two decades. It does not have upside beyond next 4 or 5 years. infact RVV-BD three times the range of it. and if Chinese buy Su-35 it will come with that. and Chinese may create there own version of extreme range missiles.

    Which one, that is better than the meteor? I ask because “you always speak about reality”

    so you think they cant make missile but they can built 4.5G fighter. Missiles are a lot easier than fighters.

    We were comparing Meteor to a hypothetical/fictional chinese missile that is supposedly going to be so capable that it would make the meteor obsolete. Do point me towards such a missile. The meteor is meant for the typhoon, Rafale, Gripen, a large fighter base, that equips the Royal airforce/navy, French Air force/Navy, Sweden, Germany, Spain etc ….Not to mention the IAF will probably also procure it.

    There is no such thing as fictional. They have the budget and industrial capability for missiles. it is not some slow process for want of money.

    They have to live with what the pick. They can hardly outsource all their procurement decisions to you. The Mig-35 LOST to the rafale.

    It is corrupt decision that’s why it is still hanging in air.

    You can start a thread comparing mig-29K’s multi role ability to that of the Rafale. The responses would be very similar. With regards to the Indian decision, that is not my opinion but a FACT. The rafale was deemed superior to the Mig-35.

    I said the decision has big question mark. no other country buy Rafale. and IN decide not to chose for its two carriers.

    India’s Non acquisition contribution(Mostly for R&D) is going to come to be over 6 billion USD, that is hardly insignificant, and comes out at around 30 million per fighter procured.

    http://articles.timesofindia.indiatimes.com/2013-07-15/india/40589765_1_joint-strike-fighter-fgfa-pak-fa

    It is some paper sketch contract of $300m. and the rest of money hasn’t been delivered.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257219
    JSR
    Participant

    That wont make any difference, since India has a pretty good idea about the radar’s capabilities, they are buying more than 100 of them, from a program where the Rafale beat the Mig-35, something that is more advanced than the Mig-29K.

    MIG-29K is already operatonal. Rafale will take another decade to be operationalized. It is paper plane specification.

    How many Mig-35’s are in service with the AESA?

    They are not in service but it does not mean they are no finished development. there are not many Rafale AESA in operations. This very low volume lab production.

    Meteor integration is still on going. It will take a few years. The IN is not going to be making a decision tomorrow. The Meteor would have been integrated by the time the decision is due.

    Meteor will be obsolete in the time frame.

    What missile would the chinese jets be using that would be superior to the Meteor?

    Chinese have a lot more money for defence. surely they are going to produce more and better missiles. You simply cant compare some one buying 10 fighters a year some one over 100.

    The Indians have already held the Rafale to be a more potent multi role fighter than the Mig-35. A version that is considered superior to the IN Mig-29K

    Indian decisions are full of holes. They even selected EF with non existing AESA as 2nd one.

    As per most members on this board, as well as the IAF and the Indian Government.

    This is your opinion.

    Go read up on the T-50 development. India has put cash for the development of the PAKFA, the money was paid in various stages from PDR to the R&D.

    I have read T-50. India does not have any funding yet.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257238
    JSR
    Participant

    Hardly matters when the same radar has been chosen to be fitted on all rafales.

    Is the radar being fitted to Naval Rafale. and when that radar is going to fitted to Naval Rafale across the line up.

    How many Mig-35’s with AESA have been produced and delivered?

    There were 10 flying AESA MIG-29 couple of years back. so sufficiently radar is developed.

    METEOR, MICA-IR (great to target stealthy J20’s, J31’s – Similar solution to what the USN is trying to acheive, to target the very same fighters), PGM’s, Stand off weaponry etc etc etc

    where is Meteor on Naval Rafale?. THat missile will be obsolete by the time of J20/J31.
    MIG-29K has very similar weopons. MIG-29K is ordered by RuN. I will not go into respective divergence in budgets (syria war is going to boost oil/gold price) and large weopon & upgrade pool of systems.

    Rafale already is a better multi role fighter to the Mig-29K, just take a snap pole and see how many actually pick the Mig-29K. AESA will likely reduce weight, maintaince and improve performance.

    how it is better multirole. Is that Kh-31 being integrated?. I say weaker engines are good for light weight airshow demo but once you load up the fighter performance degrades alot. Rafale has slower speed, lower ceiling than MIG-29K.

    From what i know, the Indians are still working on it, and intend on fielding it. Your logic is always trying to dictate what the Indians should do, while i strictly look at what they are GOING TO DO. You claim that Lockheed should have offered the F-35, and told the IAF to shut up and re-draft the MMRCA. You really need to pull back to reality or mention in your posts, that these are your views and they are different from what is currently planned by the IAF/IN.

    India cannot manage to contain weight of LCA. and that LCA is not even stressed for heavy loads yet nor upgraded engines like F414. There is little confidence of weight reduction for Naval LCA. My posts are always with reality.

    So there is going to be no cost involved to get from T-50 to T-50N? Why did India have to pay russia to Develop the T-50? Also what are the time lines for the T-50N?

    I didnot say there are no cost involved but those cost are relative minor in overall T-50 project. India hasnt paid anything for T-50 development. there will be some version of T-50 for India once it pays for it sufficiently.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257311
    JSR
    Participant

    A Lower RCS, Flying AESA radar, Better access to weaponry, SPECTRA, METEOR, MICA-IR. I am assuming here that the Rafale M can take off with the same load/fuel as the Mig-29K from a ski jump. If thats not true, then the IN would actually have to see the tradeoffs, and make a call. But if it is, then there is essentially no comparison, the Rafale is a much better multi role fighter with plenty of capability on the table, and upgrades planned.

    Is flying AESA radar on Naval Rafale? Its like saying MIG-35 has AESA so MIG-29K also has AESA.
    better access to weoponary? (for example). All the weopons systems available to PAK-FA will be available to MIG-29K. Rafale cannot become better multirole as it is smaller airframe with underpowered engines. AESA radar and operational external loads will further degrade its performance.

    I’m not familiar with what is happening with LCA_N development program.

    but atleast your familiar that LCA has gained weight and Naval LCA N will also gain even more weight. Its logical progression.

    With Naval PAKFA, you have to take a few things into account. How much would it cost to develop? When will it be available. India is already having to take a 2 year delay and pay more to develop the T-50, it remains to be seen whether they are willing to take an added risk of getting into developing a new naval fighter (version) as opposed to buying already developed, and operational fighters (By 2020-2025)..

    why would Indian pay to design Naval PAK-FA?. with newer engine PAK-FA will have the most surplus power of any fighter. add TVC, strong twin wheel landing gear, it is already ready for carrier operatons.

    in reply to: Rafale vs J-20 and J-31??? #2257407
    JSR
    Participant

    I’d agree with this too. Even J-10 induction hasn’t been that rapid judging by the number of J-7 and J-8 regiments still in service.

    J-10 induction is very rapid for modern times considering they were inducting J-11 at same time. which Indian couldnot match as MMRCA is coming after Su-30MKI.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257437
    JSR
    Participant

    The price of the F-35 is dropping every “lot” and it’s just starting to ramp up! So, I guess your against India ever procuring a Naval PAK-FA. As the Land Based PAK-FA’s are going to cost over a $100 Million. So, expect any Naval Model to cost much much more. Especially, considering the limited number likely to be produced……….

    Naval PAK-FA will be practically indentical to land based PAK-FA. only few percentage structural differences. there is no way it is limited production model.

    in reply to: F-35B vs F-35C vs Mig-29K vs Rafale for Indian Navy #2257439
    JSR
    Participant

    I would expect the LCA_N to come out to be cheaper for the IAF compared to the mig-29k’s they are acquiring from russia, especially given upgrading and operational costs (single engine, local maintenance based on local components etc). Having said that, the IN does seem to have decided on being a multi fighter force (Mig-29K, Harrier, Future LCA_N) and i would suggest going in for a more capable solution once they do have to make a call and buy more fighters (IAC1 and IAC2 going operational). Here is see both the F-35B and the Rafale M being an option, both offer more capability compared to the Mig-29K’s and the LCA_N. The Rafale M offers commonality, if Indians can secure contracts to make it at home, while the F-35B’s would give the IN access to its first stealth platform, and also an opportunity to feed into the massive industrial complex – JSF, which by 2025 or so would have peaked in terms of production rates.

    How is Rafale M offered more capability compared to MIG-29K? MIG-29K has 20% more powerfull engines. LCA-N is non starter. It will weigh 9 tons by the time it will be operational.

    in reply to: Would F-35 make sense for India in 2020-2030 period? #2258489
    JSR
    Participant

    What does the size of the fighter have to do with carrying EW gear? Are you suggesting that the ideal EW kit, that utilizes the same technology as the NGJ, would be so big and heavy that it would not be able to fit on a F-18E/F and F-35? What makes you believe in such a thing? We are talking about tactical EW jamming, not jamming the coms of an entire nation.

    bigger aircraft provides higher speed, range, more power. loading underpowered aircraft with electronics is not the best solution. F-18E top speed is already too slow. You can clearly see weight is increased, internal fuel decreased. Performance is not even written. 15ton aircraft has 6.3ton internal fuel and there is no CFT. and engine power is stuck in medium aircraft level.

    http://www.boeing.com/assets/pdf/defense-space/military/ea18g/docs/EA-18G_overview.pdf

    That may be true for A2G, and Strike, for EW, there is nothing that goes out to suggest that the F-18E/F capability to haul a load is insufficient to carry Jamming equipment. The NGJ meets the requirement for a post 2020 period and performs much greater missions then the current Jammer. The USAF has no requirement for stand off jamming from its F-35’s. The USMC may go in for NGJ, for the F-35’s, and for them it would also need to operate from their flat tops.

    EW gear is also very heavy. and smaller aircraft will have less flexibility in carrying weopons. It is just not right answer for fleet size as things get expensive.

    So i guess the Indian Defense Minister is wrong, when he claims that the IAF expects the first squadron 3-4 years after signing the contract. Could you kindly post the RFP so we can have a look at the “Flexibility clause” for ourselves. So i gues Lockheed was foolish to not offer the F-35, even though they could not negotiate on a single cost figure, or delvier a squadron 3-4 years from signing the contract, and have made no attempt to get TOT agreements signed between the 2 nations.

    there is alot of statements floating around of this and that date. there is no credibility left.

    http://www.hindustantimes.com/editorial-views-on/InterviewsNews/Rafale-is-as-good-as-any-existing-5th-generation-aircraft-French-defence-minister/Article1-1098852.aspx
    Rafale is as good as any existing 5th-generation aircraft: French defence minister

    Lockheed simply didnot understood the system. Flight trials done too early that were wasnt any AESA EF one of down select aircraft for trials so when non existing AESA aircraft can participate and go to #2 position. what is left in this process?

    The Indian Defense minister is on record of claiming that he wants the first squadron delivered 3-4 years after signing the contract. I may not be able to calculate the weapons cost for 126 rafales, but the IAF certainly can as the bidders did bid for it, just as Lockheed bid for the cost of the weapons that came with the F-16I, and Boeing did likewise for the F-18E/F.

    wanting and implementing is two different things.

    Absolutely ! That is what the MMRCA is about. There is no chance that the Indians wont make the rafales at home. They have done the same for many crafts before the MMRCA, and this seems to be a core requirement for the MMRCA.

    THis is not going to happen. It didnot happen with LCA engine. it is not going to happen with Rafale or any other fighter. It is just clue less nature of RFP or just to increase the cost of project to such level under the name of TOT that massive corruption can be justified.

    Unlike you, i have not seen the RFP document, but i have seen reports citing the Indian Defense Minister stating that he wants a squadron by 3-4 years post inking the deal. I also know that Lockheed did not even bother to bid the F-35 for this program, as they have done for so many other programs that also see the F-35 compete with 4.5 gen fighters. Clearly the F-35 would have been a more technically superior bid compared to the F-16I, therefore what stopped them was probably the specifics of the RFP’s as far as delivery and TOT issues are concerned, as well the inability to be competitive by submitting a fixed price that can be negotiated with the Indian Government. Dassault is currently hammering out the contract and once signed it would be a fixed price deal for at least the fighters that dassault will make at home. Lockheed CANNOT do the same, for the concurrency cost would not be known for quite some time. Lockheed could also not deliver anything significant as far as numbers go pre-2020, in fact to do the same they would have to bid that they expect some partners to cancel or delay their order, such would involve risk and plenty of potential for a delay.

    I never claimed of seeing RFP but i it is flexible as there is no definite time of implementation or fixed price. and time has proven it. This deal is no longer about pre-2020 but post 2020. where LM is in better position.

    That is the part of the deal that India must have evaluated when they chose the rafale over other offerings that had a much bigger industrial base compared to it. Fighters such as the Typhoon or the Super Hornet. Clearly they see that despite this the rafale offers a better proposition for them, for whatever reason.

    what ever the reason? India perhaps overestimating its financial and technical abilities to single handidly deal with rafale advancements.

    in reply to: Would F-35 make sense for India in 2020-2030 period? #2258892
    JSR
    Participant

    So what do you suggest LMA do? Write a letter as a part of the bid, which tells the IAF that the deal is a JOKE and screw you , we are bidding with a fighter that we consider to be better, but that cannot meet some if not most of the RFP requirements.

    And as far as the deal taking forever…Far from it, The timing is fairly consistent with the Indian defense process, as per what i make.

    first that RFP is completely flexibile interms of timelines and price. so there is no reason JSF cant participate.

    Do you understand what a single cost means? It means, given the requirements set forth by the RFP, what price Dassault can offer for the fighters it is going to make. Given the deal may be different for different buyers, the price is also likely to be. So India will buy in Lot 10 (JSF)…How does this give you deliveries that were required for the MMRCA?

    where is delivery requirement and contract signing period?. you cannot even calculate how much weopon cost for 126 Rafales. I understand the initial 18 JSF arrival will be slower than 18 Rafale but rest of JSF from kits will be much faster and weopons much cheaper.

    Go tell that to the Indian Air Force, Indian Government, French Government and Dassault. I am sure this would be news to all of them.

    these governments have hardly shown any competency in economics. it is beyond there scope to maintain active and upgraded production line post 2020 period. neither France nor India can do fracking on scale of US to sustain a surplus economic system.

    Who cares? The IAF can hardly care, since they would be making the fighter at home. What investments are made to the line in France or Fort Worth hardly matters to them. But i do agree,, a brighter future for the JSF production process, does ensure sustained upgrade investments from all source. However this is besides the point since the MMRCA competition did not have LM bid with the JSF, for it would have been disqualified for failure to meet requirements. You cannot buy something the vendor did not offer for trials.

    Do you seriously think they will be making Rafale at home? Let try Snecma engine and Thales Radar for LCA first. failure to meet requirement? first you don’t even know the requirements, time line and cost so how can some thing be disqualified unless for some corrupt practices.

    The Indian Rafales will have AESA to begin with iirc

    I am giving example that India alone cannot sustain Rafale upgrades when market for Rafale upgrades is more minsicle than M2K.

    So what you are saying is that the IDEAL FIGHTER EW solution would be one that MAY exceed the max payload capacity of the F-18E/F or its bringback? Is this a joke? You fit onto a fighter the EW that is tactical and meant for a fighter. If you want something bigger in size and scope, you opt for non-fighter platforms such as the EC-130 or Bigger bombers. The NGJ is designed to be used by the USN fighters, and as such it is designed with the mission of tactical EW in mind.

    http://img837.imageshack.us/img837/514/7okr.png

    USN fighters are constrained by size of aircraft carrier. there is no reason for Airfocres fighters to be that size. EC-130 is not some extra power thing. I was giving example that you can make large 4.5G fighter with 5G engines and greater payload capacity. and that is right solution.

    in reply to: Would F-35 make sense for India in 2020-2030 period? #2259245
    JSR
    Participant

    You can not deliberately bid with a project that you know cannot meet the RFP requirement, in the hope that the project would be delayed and you may meet the new deadlines/schedules. An executive that does this, will have a short lived career for lockheed martin. Hence, they went in and bid with a proposal that could actually meet the requirements.

    That RFP is joke. you cannot buy French production 60 Rafale for $10b let alone with TOT 126 Rafale for $12b. (that excluding super expensive weopons)That RFP has no bearing on reality. thats why this endless negotiation for price, life cycle cost and TOT. IF JSF does not meet RFP so does Rafale.

    The LRIP 6 and 7 contracts, are not fixed per say. Lockheed martin has a separate arrangement with the DOD on concurrency costs, and those would be over and above the cost negotiated at LRIP, and that cost is bound to fluctuate as testing matures. So in reality the contractual cost for the First 10 LOT’s does not represent the FULL cost. Lockheed cannot offer ONE SINGLE Cost figure to bid for the MMRCA as concurrency costs are not known to the $ as of now.

    India will be some where in lot 10 and after produciton cost. Dassualt also cant give single cost figure. It has one cost figure for Brazil, another from UAE and another for India. and another for French.

    That does not take away from the fact that this is a requirement, just as it was for the Su-30 Contract. Lockheed cannot bid with a letter that reads
    Hence LMA offered what they could deliver as per the RFP, i.e. the F-16I

    RFP has become obsolete since flight trials ended couple of years ago.

    LMA production process and logistics are based on the currrent JPO driven production process. The Line may be able to sustain growth, but someone has to pay the money to acheive the same, hire workers, tooling etc etc. No study has been done to show how much this would cost, nor has LMA ever bid that amount as part of their contract for any competition. No one till date has asked LMA to increase their production in the next 3-4 years to hammer out one additional squadron of fighters.

    LM has assurance of steady budgets post 2020. Dassualt dont. infact most of EU defence industry will be dismantled if current trends of Arab procurement diversification contiunes. Post 2020 is the most riskiest part of contract implementation. India simply cant afford Rafale upgrades. just like M2K will be retired without engine upgrade and non AESA radar.

    That is hardly a problem, when the USMC is looking at a tactical EW solution for use by its fighters. There is no reason to believe that the NGJ does not meet the stand off jamming needs of the USN, any suggestion has to be backed by evidence. Your argument that the F-35 being a 5th gen design compromises on the ability to carry EW gear holds no water, for whatever EW solution the services are looking to put on tactical fighters, is compatible with the F-35. We can only discuss current and future EW Jammer packages, we cannot make up a fictional EW Setup and see whether it fits on the f-35 or not. NGJ is going to be cutting edge, AESA (GaN) based Stand off jammer for the tactical fleet, it meets all the demands for 2020+ time frame that the USN has placed. All it has to do is meet the requirements set forth by the customer.

    EW is limited to size of platform. USN requirement is built around the limted size of aircraft carriers. It cannot built some thing that cannot be lifted from Carriers. so it may not be best solution.

    in reply to: Would F-35 make sense for India in 2020-2030 period? #2259715
    JSR
    Participant

    So you wanted LMA to assume this sort of delay during the RFP stage, count on it, and offer something that it could not deliver without there being a significant delay between contract downselect and contract signing?

    As I said its Indian procurement project. there will be delay anyway. LM has the least risk as they will have very active production line post 2020.

    As per the original MMRCA requirement, the IAF would only buy a squadron or so from the “Home Production Line” with IOC goals of 3-4 years from Contract signing. The rest of the aircraft would have to be produced in India. That part of the contract/demand still stands. So what lockheed martin does with the production line post 2020, does not matter. Moreover we do not know what those JSF would cost. LMA CANNOT offer a fixed price.

    It is all about post 2020 as this decade is pretty much past for any kind of operational and effective induction. LM can surely provide fixed price otherwise how it is signing thos LRIP 6 and 7 contracts. It is the Dassualt that will have difficulty in post 2020 period.

    The IAF cannot go outside what the vendors actually bid. Lockheed could not bid with a product that they could not deliver according to the contract. There were also issues with the ability of Lockheed to actually bid with a fixed price, which they could not.

    Fligth trials were completed around 2011. there was not EF AESA or Meteor integration. So it is all future plans. LM could not provide flight trials in 2009 to 2011 period.

    The explicit requirement for the MMRCA is to produce the fighters in India. After the first squadron or so is delivered from the home production line, the rest of them have to be produced in India.

    Your assuming Dassault can manage this requirement of making Rafale in India. it is like saying airbus will make A320 in India. which is simply not cost effective. both LM and Dassualt are in same boat.

    Who’s going to pay the cost to ramp up production beyond the number already contracted?

    Contracts are still below the production number LM assumed.

    Fighters carry systems, and sub systems designed for fighters. If you go out and design a EW solution for the B-2, there is no way you are going to have the F-15 carry it for example. The NGJ has the power, capability that is required from a stand off jammer for the USN for the future. The F-35 can carry it, without any constraint. So there is no question of an inferior system being mounted just so that it could work on the F-35. The F-35’s avionics and power architecture has been designed keeping DEW’s in mind. The ABC program is already underway, with Lockheed contracted to develop a DEW solution for the F-35.

    B-2 has little advantage over twin engine high afterburning large fighters interms of carrying capacity and power. Problem with F-35/F-18E is they are designed around carrier size. so they are not that effective solution for long run way land based airforce.

Viewing 15 posts - 3,001 through 3,015 (of 4,319 total)