The F-22 has to add lots of hardware to get to the diversity of the F-35 (avionics and role wise). While the F-35 may have to adapt and change items (as they are still in SDD) , they will not have to add hardware that is not already planned.
The F-35 also has a MUCH larger post-SDD user base that will have a MUCH larger chance of getting updates done. How’s that working out for the F-22 (still no IRST, cheek arrays, delayed weapons, delayed comm upgrades, no HMD, Blk differential problems, etc)?
The F-35 already has the FLIR/IRST, internal jamming bays (currently empty), EODAS, a spare ICP bay, HMD, 2k bomb capability, open spec hardware, fiber avionics interconnects, UAI, etc. The F-22 has a long way to go just to get to the F-35’s avionics capabilities, not vice-verse.
All those issues (vibration, thermal loads, etc) will not change what the component will do, just what (if any) needs to be adjusted to realize it’s known functionality.
Also, the component integration is being done to a higher (and smarter level) in the CATB than was done in the F-22 program.
@LO: Did you notice that the QLR talks mostly of airframe issues (that’s what I meant by “exact airframe performance”) and not subsystems, which was my point. Besides, the QLR is relating risk in regards to concurrency cost, not risk in regards to “if” it can be done.
@Nicolas: Your forgetting A2A which UCAVs cannot do. You now have three airframes on the CV (UCAV, A2A, and cheap multi-role).
What happens when you go against an enemy that can jam your comms or (God forbid) hack your UCAV controls? Now you are left attacking him with your cheap multi-role fighters or your stealthy A2A.
The point of a single, stealthy multi-role force is that they ALL can do whatever is needed. The days of single-role fighters is over.
Given that the FRP F-35 is only 15%-20% more expensive than the F-18E, having two different fighters (higher parts, training, & support costs) is not worth the miniscule difference in total lifetime savings (if there is any).
I suppose there is nothing stopping an AMRAAM from being guided to strike a ground target. They have already done that with the 9x.
Most of the systems (APG-81, EOTS, EODAS, ESM, etc) have been through years of lab and flight testing and what they can and cannot do is well known at this point.
The only unknown is exact airframe performance and how long it will take to integrate the info from all the individual systems.
“Hinting at super-cruise” source:
BTW Norway is in the process of re-winging several of the old F-16, perhaps anticipating further F-35 delays…?
Increased use and higher than normal payloads that was planned for, not anticipated delays.
“We use the planes in a different way than we used to. They have taken off and landed with heavy loads of bombs, and that causes extra wear and tear,” Hoelsæther explains.
LO, only companies from partner nations get to bid on contracts for the JSF. Currently only SDD contracts have been signed and no long-term FRP contracts have been signed (so the exact language of them in unavailable).
LM was able to get around this for Japan due to them giving up a piece of their pie.
Any part that Japan builds for the F-35 is coming from the LM/P&W portion of the pie. LM/P&W are giving up a piece of their own pie in order to increase the overall build numbers.
What parts this covers is not known at this time.
Japan is not part of the partnership and therefore will not get any contracts that would normally go to the Partner countries. What will happen is that the partner countries that have component contracts will likely see those go up (for the parts not made in Japan) for the entire life of the program (original build and spare parts). Win-Win for everyone.
4+ SDBs plus the special rack to hold them > Mk drag 🙂
That looks like a copy of a SM-1. Btw, that ship only carries two, one facing port and the other starboard.
I don’t think that those were SDBs on the Gripen, no wiglets and more than 4 to a launcher (unless this is a new Saab bomb/rack).
The F136 has not come close to finishing R&D. After that comes a few years of testing before going into production. That puts operational F136s towards the end of the decade.
For Japan to fund the finishing of the F136 on the hope that someone else would buy it is, quite frankly, a big gamble that is not viable in the current economic climate.