I like 😀
Reminds me of the old UA scheme.
I like 😀
Reminds me of the old UA scheme.
I’m not sure, it started of at £60M, but that might well have been increased?
£96 million last I saw 🙂
I’m not sure, it started of at £60M, but that might well have been increased?
£96 million last I saw 🙂
Looks like it, I hope they continue the EDI-PRG route into the
winter months..plus I hope BAA give them the same winter discounts that are available elsewhere. 😮
Now by saying BAA you are suggesting other airports, correct you did not mention any specific one but BAA do own 7 in the UK. 🙂
Looks like it, I hope they continue the EDI-PRG route into the
winter months..plus I hope BAA give them the same winter discounts that are available elsewhere. 😮
Now by saying BAA you are suggesting other airports, correct you did not mention any specific one but BAA do own 7 in the UK. 🙂
Can you give us a exact link to the Boeing and Airbus drawings ? plz
I can find the Airbus templates but they won’t work, so could someone link me to the Boeings.
Can you give us a exact link to the Boeing and Airbus drawings ? plz
I can find the Airbus templates but they won’t work, so could someone link me to the Boeings.
Can anyone give an ETA for arrival at GLA with winglets?
Can anyone give an ETA for arrival at GLA with winglets?
Boeing do not, repeat do not fit the winglets. Other companies are contracted to do so.
Boeing do not, repeat do not fit the winglets. Other companies are contracted to do so.
1- The new tunnel linking Terminal 1 with Terminal 2 is not far from completion and the archways on the new structure look pretty big and are very impressive.
2- The development of a new 750sqft 2nd floor on the international departures area is now well underway but no idea when it will be finished.
3- A new baggage reclaimed belt will be installed in the international arrivals area with in the next month.
4- The old Loganair hanger will be pulled down soon to make way for the 2nd international pier.
Looks kind of what I’ve said recently 😉 lol
1- The new tunnel linking Terminal 1 with Terminal 2 is not far from completion and the archways on the new structure look pretty big and are very impressive.
2- The development of a new 750sqft 2nd floor on the international departures area is now well underway but no idea when it will be finished.
3- A new baggage reclaimed belt will be installed in the international arrivals area with in the next month.
4- The old Loganair hanger will be pulled down soon to make way for the 2nd international pier.
Looks kind of what I’ve said recently 😉 lol
Was it supposed to have them?
“The Boeings are fitted with blended winglets. These are new features designed by Boeing and they are highly efficient, saving us four per cent on fuel bills. We are the launch customer in the UK for the fitting of such devices.”