Weight problems with the STOVL version caused a two year delay. The F-35A/C never had a weight problem but they have benefited from the SWAT trimming done to the F-35B. The rest of the delays can be spread across the rest of the program (production management, ramp-up, software, minor mechanical issues, and projected additional flight tests).
I think he meant the Iran-Iraq war, not GW1.
btw, it was just a bunch of TOW missiles and some HAWK parts.
The 2nd F-35B (BF-4, a missionized F-35B) has arrived on the USS WASP, it didn’t melt the deck either 😉
http://www.youtube.com/watch?v=puj5lueXmJQ&feature=player_embedded
The F-35’s IOC was NEVER 2008, ever. According to the 2001 schedule (the year the X-35 won the contract) the F-35B’s IOC was 2010 and the F-35A’s was 2011. Since then there has been a SWAT redesign and other delays.
While your at comparing IOCs and delays, you might look at the fact that the JSF’s IOC plan calls for going IOC with more capability than the Eurocards CURRENTLY have even thought they are many years POST-IOC. On that note, a Block1 (9 years of development) F-35A has more sensor and combat capability than the EF did at IOC (after 17 years of development). So please, don’t try and compare US SDD programs, the delays, and the final IOC product with Eurocards that came to IOC with development still needed.
Canada and Australia are not European. Not including their contribution makes the European Then Year SDD funds total only $3.1 billion, not $5 billion.
Was that Rafale dev cost just the initial version, or everything spent to date (the article was in April 2008)? Keep in mind that the 5.7 billion is in Euro which is $7.61 USD.
One of the reasons that JSF cost so much to develop (besides the fact that it is 3 airframes) is that they saw the problems that the F-22, Rafale, and EF has with a spiral development plan and getting to where it needed to be (ie F-22 not having a FLIR, HMD, limited weapons, etc; the Rafale not having an operational AESA, no HMD, inability to self-designate, and the whole VLO issue; and lastly the EF not having an AESA, DASS problems, no A2G (or very limited depending on version) and the non-VLO issue). The JSF program decided to “bite the bullet” and develop all of the systems needed to make the JSF an effective, frontline multi-role fighter from day one of IOC so that post-SDD wavering on dev costs would not hamper the JSF in the field (as they have with the Eurocards).
That is just government supplied SDD funds. That does not include funds spent by companies to upgrade their equipment in order to produce the parts that are part of the contracts.
It would have to tankup very quickly if it did a VT with a 5k payload (3k weapons and 2k fuel) which leaves a 4-5k thrust buffer.
STOVL & VTOL are virtually interchangeable terms for the F-35B. Technically it can do a VT, but operationally it will not.
JSF did not suck the money out of Europe. They never had it to being with.
Here is the development cost caps for the JSF project.
<br />
Table 5-1 (In TY U.S. Dollars)<br />
Participant Maximum Contribution<br />
Australia $0.690B<br />
Canada $0.551B<br />
Denmark $0.33B<br />
Italy $0.904B<br />
The Netherlands $0.586B<br />
Norway $0.33B<br />
Turkey $0.690B<br />
United Kingdom $0.952B<br />
United States $16.843B<br />
As you can see, the VAST majority of the development funds came from the US (as it should since they are buying the majority of the F-35s). The top two European Partners gave less than a billion each, some less than half a billion.
Props to Xav
Here is the video of the first STOVL takeoff and a few more landings.
It performed it’s first shipboard takeoff on the 4th.
Piloted by Marine Lt. Col. Fred Shenk, BF-2 lifted from the deck of the USS Wasp at 8:45 a.m., Joint Strike Fighter Program Office officials confirmed.
The F-35B will conduct 67 takeoffs and landings at sea over the next two weeks as part of its initial sea trials. However, Wasp is available to the program for six weeks if needed.
We have LIFTOFF
Piloted by Marine Lt. Col. Fred Shenk, BF-2 lifted from the deck of the USS Wasp at 8:45 a.m. {Oct 4th}, Joint Strike Fighter Program Office officials confirmed.
No video yet 🙁
Props to Solomon.

The days of controlling what weapons go on what fighters is quickly coming to a close. UAI (which is also a NATO standard interface) will allow countries to integrate their own weapons (as long as their features are covered in the spec).
That is okay for the short term, but to have a coordinated training program they need to all be in one location. So the original question still is unanswered, will they consolidate, stick with only 6 training F-2Bs, or substitute something else?