The Marines are looking to end the “2-year” probation early based on the pace of testing & planned fixes for known problems.
http://www.reuters.com/article/2011/03/08/lockheed-fighter-idUSN0818482120110308
The U.S. Marine Corps’ top general said he wants an early end to a two-year “probation” imposed on the short-takeoff version of the Lockheed Martin Corp (LMT.N) F-35 fighter jet and is encouraged by its progress since a major program restructuring.
…
“My sense is I’m optimistic,” Amos said. “We are on a two-year watch. It’s my hope that we can get off that well before two years.”
Amos said he planned to offer Gates a set of metrics this spring that would measure progress on the plane and allow the Pentagon to lift the current probationary status.
The Marines are looking to end the “2-year” probation early based on the pace of testing & planned fixes for known problems.
http://www.reuters.com/article/2011/03/08/lockheed-fighter-idUSN0818482120110308
The U.S. Marine Corps’ top general said he wants an early end to a two-year “probation” imposed on the short-takeoff version of the Lockheed Martin Corp (LMT.N) F-35 fighter jet and is encouraged by its progress since a major program restructuring.
…
“My sense is I’m optimistic,” Amos said. “We are on a two-year watch. It’s my hope that we can get off that well before two years.”
Amos said he planned to offer Gates a set of metrics this spring that would measure progress on the plane and allow the Pentagon to lift the current probationary status.
The above scenario would be better served by F-35Cs off from a CBG. Faster reaction time and better survival rates for the F-35s compared to the B1-R.
What about the canceled T-46? Fairchild was sold to M7 who was bought by Elbit.

It could be an interesting partnership build.
Nevermind, too slow 😉
They also forgot to mention the new rocket accelerated penetrating missile (Next Generation Penetrator) that will fit internally on the F-35 (so it can carry 6 total) and the B-1/B-2. It’s range has not been stated but since it’s part of the Long Range Strike concept, I am sure it’s over 200 miles.
The report makes a lot of assumptions of Chinese air power and does not really evaluate the effectiveness of Taiwanese or US air power (land & sea based).
I am thinking Japan, Singapore, and maybe South Korea.
SK could make a T-50 & F-35 cross procurement deal.
The multiple simultaneous P&D operations are offset by the fact that the boom can refuel a fighter more than twice as quickly as a P&D setup.
SURE they were written by Boeing 😉
If you look at the AF as a whole then you might say they wanted the KC-30. But, this time around the AF refuelers told the cargo guys to pound sand and stuck to the original specs.
If the cargo guys want hauling capability then let them buy C-17s or 747/777 Freighters.
I was reminiscing about when we had Ronald Reagan as president. It was a booming economy and we had the greats like Bob Hope and Johnny Cash.
.
.
.
.
.
.
.
..
.
.
.
.
.Now we have Obama but no Hope or Cash.
.
.
.
.
Sorry, I could no help myself 😉
Wiki (I know, I know) say about $15 million US.
The M-346 also has two motors compared to the T-50’s one.
There is also the issue of Italian labor costs compared to Korean labor costs.
Besides, to be a true trainer for the US, you will need the radar and weapon systems anyways, so that will add to the M-346 cost.
I see the USAF creating a bid process like they did with KC-X. It will have clearly defined specs and will come down to price. If Boeing tries to enter with a clean-sheet design, I do not see them wining due to the risk involved and the increased cost of development.
Since they already are a small part of the M-346, they may try and do a combined bid like NG/EADS did on KC-X. In that case they have a chance.
With the economy continuing to tighten I cannot see any future large contracts not being a set of specs & cost like KC-X was.
KAI T-50. It does not need the LO features of MAKO and is already flying (ie dev done).
It already has US parts, just switch to an all US engine & put more US avionics in it and it’s ready to fly.
Either mfg parts here for Korean assembly or mfg parts there for US assembly.
Win/Win for US and Korean partners.