I did say delays “up to this point”. Going forward is a different issue.
Notice that it says “could delay”, it’s not set in stone.
I think most of the answers is found in a single pic.
Nice job taking that pic out of context…. you forgot the largest part of that which is driving up the per-hour cost, ie “UNIT-LEVEL MANPOWER”. If the USN (at least this person giving the presentation or the JET) decides to ignore the reduced manpower needs and consolidation plans for the F-35 then how can LM be blamed?
Their second mistake, “SYSTEM IMPROVEMENTS”. Dev for the F-18 is pretty much done. However, the F-35 has many years ahead of it where the systems have already been mapped out through Blk 6. Not quite apples & oranges is it?
JET will come around to the new MPN numbers just like they did for cost numbers.
The delays that have plagued the F-35 (up to this point) have barely anything to do with it’s avionics. They have been SWAT, production ramp-up issues, or physical issues (ie engine, bulkhead, hinge, electrical, etc).
Using an avionics spiral dev program would not have helped with the past delays.
In what way is the US not being “accommodating” where the customer was expecting them to be?
As the news that came out this week stated, those numbers are based on assuming the same man planning for the F-35 as per 4th gen and completely ignoring advances in personnel reduction that the F-35 is based on.

I’ve never seen a ‘KC-390’, what does it look like??:confused:
Update on BF-05, current status, and 2011 test plan:
Steps Forward, Step Back for F-35
Posted by Graham Warwick at 1/28/2011 9:53 AM CST
Lockheed Martin flew the fifth STOVL F-35B yesterday (Jan 27), taking the number of aircraft in the development flight-test program to 10. The fourth CTOL F-35A, meanwhile, was ferried to Edwards AFB on Jan 22.Under the current plan, two more development aircraft remain to fly, F-35C carrier variants CF-2 and -3. They are expected to ferry to NAS Patuxtent River by June. But construction of a third CV test jet, CF-5, has begun and more aircraft of all three variants will be added to the flight-test program under the replan now being put in place.
Lockheed’s CEO, Roberts Stevens, told analysts yesterday that the company is planning to complete 872 test flights this year, more than double the 410 flights achieved in 2010. In addition to the four CTOL, five STOVL and three CV test jets, the first two production F-35As, AF-6 and -7, will fly in the test program this year.
But Stevens also warned that Lockheed may not be able to lower the F-35’s cost in Fiscal 2012 because of the Pentagon’s plan to trim procurement to 32 from 45 – to help pay for the extra development resources and time provided under the replan.
With 32 aircraft purchased in Fiscal 2011, production rate will remain flat through 2012 and Lockheed will not move down the learning curve as fast as it has over the first four production lots. The Pentagon plans to return to a 1.5-times ramp rate in 2013, but the near-term cut will make it harder to meet the unit-cost targets.
Blk 0.5 was never intended to be the training Blk, so it can not be seen as a failure. Blk 1 is already flying in CATB, BF-4 (IIRC), and will be in AF-4 as soon as it’s done with RCS testing.
Yes, because, as he has made clear by his actions in the past, Grey Area is himself biased against the F-35, and has no problem letting that bias affect how he moderates threads.
I think what he is trying to do is keep the “News” threads just that, news. I think we should give him the benefit of the doubt and go with that.
There is another F-35 thread for general discussions, debate, rants, flamewars, etc 😉
here: http://forum.keypublishing.com/showthread.php?t=106384
EODAS is necessary for MLD functionality, WVR tracking (friendly, enemy, & unknown), night operations, CAS (visual queuing of moving ground targets), etc… and has not caused any delay with the program.
So what benefit would there be to not including it? It’s already fully integrated (with EOTS, radar, datalinked info, and the ESW) in Blk 1 software.
The LRIP aircraft are IN ADDITION to the F-35s being used for SDD testing (both air & ground testing). LRIP aircraft are going to be delivered to their respective services for integration into their training and testing fleets. IIRC, a couple of the LRIP aircraft are going to be used as temporary SDD F-35s then will be transferred to their service one it is done.
Here are a list of the SDD aircraft (as best I could find):
AA-1 (Production representative prior to SWAT)
AF-1,2,3,4 are SDD Airframes
BF-1,2,3,4,5 are SDD Airframes
CF-1,2,3,4 are SDD Airframes
AG-1 CTOL ground test airframe.
BG-1 STOVL ground test airframe.
CG-1 F-35C ground test airframe.
AJ-1 F-35A durability article
BJ-1 F-35B durability article
CJ-1 F-35C durability article
That’s 14 flying SDD test aircraft (not including borrowed LRIP F-35s) and 6 ground test aircraft.
No recon? Have you forgotten EOTS, EODAS, SAR mapping, EWS, Satcoms, and the ability to mount whatever RECCE pod they feel like certifying?
LOL, the only pictures in those articles are Hawk anti-aircraft missiles. Pic Fail!
That would be the X-32 Monica.