Certainly some skilful flying. I remember seeing crop spraying aircraft doing this on TV. I think it was when the spraying season had finished (in Africa ?) and the pilots blew off a bit of steam, by ski-ing along the local irrigation canals.
A couple of pictures from the service today
Including the aircraft which did the poppy drop.
Thanks for that, somehow I had it in my mind that it was on Tuesday, but that’s another programme with a similar theme.
Is this a new (2 part) series ?, as it sounds vaguely familiar.
Only been the once, and found the staff very friendly. One suggested my wife and I sit in the Jet Provost while
he took a photo of us.
Nice photos. What is the aircraft on the left, in the second photo. Looks like a trainer ?
I remember it well 🙂
I was at a series of astronomy talks last weekend. The final presentation was given by someone involved with this project.
Now, I am not a technical person, but a friend who was with us is an engineer. His comment at the end was something like
“No b****y chance” The technical details had more holes than a Swiss Cheese.
One of those skydivers look as he narrowly avoided hitting the propeller.
It’ll only work if they can get a major airline involved. Like EazyJet have with Southend.
As said, they will need the rail links in first.
It’s probably something which is nigh on impossible to calculate, but I wonder what percentage of bombs
failed to explode on impact ?
It still pales into insignificance when you compare it to the death and injuries still caused by UXBs from WWI.
There are still plenty of UXB’s in London.
The attitude here is, we know where “most” of them are but leave them alone until there is a need for them to be disposed of.
If there is construction work to be undertaken etc.
In Germany, (I believe) they have to dispose of any “known” bombs straight away. Although there must be a lot they don’t
know about.
An amazing memorial, and they’ve certainly put a lot of effort into it.
I wonder how they have protected the names from getting sand blasted ?
Ont Telly tonight, it seems that IF they build the new Rail Link, it will “Only” cost 40.2 Billion Pounds. That’s at todays prices. Probably be finished in 2020?
Jim.
Lincoln .7
If it does ever get started, perhaps you should run a book on it’s final cost and completion date Jim ?
I reckon it will be closer to £60billion than 40, and finished in late 2021.
With the head honcho getting a knighthood from the king.
If it does ever get completed, one of the first effects will be an increase in house prices in the midlands. As it will
become the new London commuter belt.
Ont Telly tonight, it seems that IF they build the new Rail Link, it will “Only” cost 40.2 Billion Pounds. That’s at todays prices. Probably be finished in 2020?
Jim.
Lincoln .7
If it does ever get started, perhaps you should run a book on it’s final cost and completion date Jim ?
I reckon it will be closer to £60billion than 40, and finished in late 2021.
With the head honcho getting a knighthood from the king.
If it does ever get completed, one of the first effects will be an increase in house prices in the midlands. As it will
become the new London commuter belt.
A reminder that Stow Maries will again be holding a remembrance service.
Sun Nov 10th Service starts at 2:00pm.