No MiG-35s? No upgrades for the legacy Mig-29s (rumoured to a so called “SM2” standarad )?:(
are you willing to pay?
Mi-8M – the planned 3rd major upgrade of the veteran Mi-8. Among other changes, it’s suppose to get the Mi-38 rotor system and engine.
it’s ca.2007 plans, abandoned soon after
current Mi-8 modernization plans are much less ambitious
http://www.sldinfo.com/?p=19145
Under the SAP 2011-2020, the Air Force will procure up to 70 fifth-generation T-50 Fighters, 96 multirole Su-35S fighters, as many as 100 Su-34 frontline bombers, up to 20 An-124 heavy transports, 50-90 Il-476 transports, and as many as 120 Yak-130 advanced jet trainers. The Air Force will also order 900-1000 helicopters, which includes 250 Mi-28N attack helicopters, as many as 120 Ka-52A and Ka-52K attack helicopters, 22 Mi-35M attack helicopters, and as many as 200 air defense systems.
recently declared plans are 48 more Su-35S (96 total) and 70 PAK FA till 2020
I thought 476 has a new wing? :confused:
Why would it take so long to finish the first one if its the same?
Wing of 476 (aka Il-76TD-90A/Il-76MD-90A) has the same shape BUT different construction based on IL-96 experience – less wing panels, lighter support elements, much more. But the main thing about 476 is switch to paperless design documentation. Myriad problems with last one, deficite with experienced staff are main delay factors.
Il-76 and Il-76TD payload-range comparison. Pretty impressive improvement, Il-476 should add to that.
Add to what? Il-76TD(MD)-90A compared in presentation to Il-76TD, and ‘Izdeliye 476’ are the same thing:)
you must ask a guestion if industry able to produce Su-35S in numbers even with sufficient funding. KnAAPO for example is busy all around with several programs
117S is offspring of 117 with lower performance and export clearance
117A was a parallel development with 117S with higher performance but much lower resource on a way to 117. 117A mockup was publicily shown during MAKS 2001 airshow by Putin’s written order recieved via Chepkin’s request to him. Engine compressor face was hidden from view via canvas. Tests started on T-10M-10 (‘710’) in 2005 but soon were stopped due to vibration glitches.
http://www.kommersant.ru/Doc/833099
Kh-58USHK size was one of the key decision factors for T-50 weapons bay length, as this version for internal carriage was extensively lobbied by KTRV. And no, you can’t carry two of them per bay.
spoilers
Why? It pulls through the vertical.
get it in one!
Unless the plane is flying above the sun, that pic is manipulated.
pic is not manipulated – Yuri Stepanov
Uh, does that mean this Type 30 engine has all ready been installed in one of the aircraft??
According to Chepkin, yes
Because publishing houses are closing. Speciality Press and Midland are on the list. Piracy is not the main case, but decreasing numbers of potential readers interested in subject.